Browse
Search
OTHER-2022-020 Service Agreement with O'Brien Atkins Facility Master Plan
OrangeCountyNC
>
Board of County Commissioners
>
Various Documents
>
2020 - 2029
>
2022
>
OTHER-2022-020 Service Agreement with O'Brien Atkins Facility Master Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2022 3:10:16 PM
Creation date
7/15/2022 2:39:28 PM
Metadata
Fields
Template:
BOCC
Date
5/3/2022
Meeting Type
Business
Document Type
Agreement
Agenda Item
8-h
Document Relationships
Agenda for May 3, 2022 BOCC Meeting
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2022\Agenda - 05-03-2022 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Post Office Box 12037 | Research Triangle Park, NC | 27709 <br />919.941.9000 | www.obrienatkins.com <br />P | 4 <br />o Projections Database <br />Using data obtained from the completed survey instruments and detailed <br />interviews, the consultant will develop a projections database for the County. <br />The first database component will be to prepare a projection of future <br />personnel requirements for each staff-driven department. The projections will <br />quantify changes in personnel in five-year increments up to 20 years. The <br />personnel projections will consider official County population forecasts, historic <br />trends, and agency-specific workload factors indicative of the functions <br />performed. For departments that are not staff-driven, the consultant will <br />identify the impacting growth factor and project the unit need in five year <br />increments for 20 years. <br />Using the unit projection (staff or other) and recommended department space <br />standard (DGSF/unit), the consultant will calculate total DGSF required for each <br />department in five-year increments for 20 years. Space projections will be at a <br />department gross level to develop block space needs for options development. <br />o Gap Analysis <br />The consultant will identify the gaps between existing facilities and the overall <br />ability to meet current and future space projections. The analysis of the current <br />state to future needs will identify the facility gaps and the opportunities for <br />future development. <br />Task 4 - Conceptual Planning & Design <br />o Prepare 3 planning concepts that accommodate the space needs identified <br />Phasing plans for short, mid and long-range plans <br />Refine plans in work sessions with County and select a preferred option <br />o Real estate broker overview of existing County owned facilities <br />Broker opinion of values for the following County owned facilities identified in <br />the RFP that have been relocated to new facilities or temporarily vacated due to <br />unsafe building conditions (i.e., mold). <br />o Dept of Environment & Agricultural Services <br />o Detention Facilities <br />o Public Defender Building <br />o John Link Government Services Center <br />Identification of relocations sites for potential future construction and/or lease. <br />Review status of current leases <br />o Cost analysis Pro’s & Cons of owned versus leased scenarios <br />o Potential remote work strategies <br />Conceptual design of a new County Administration facility <br />Exhibit 1 Page4DocuSignEnvelopeID: A38E21CF-B747-4509-998D-B86E99337E40
The URL can be used to link to this page
Your browser does not support the video tag.