Browse
Search
2022-238-E-AMS-WB Brawley Company-Upfit WCOB 3rd Floor
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-238-E-AMS-WB Brawley Company-Upfit WCOB 3rd Floor
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2022 10:46:04 AM
Creation date
6/28/2022 10:45:31 AM
Metadata
Fields
Template:
Contract
Date
6/23/2022
Contract Starting Date
6/23/2022
Contract Ending Date
6/28/2022
Contract Document Type
Contract
Amount
$356,554.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised 06/21 3 <br />f.If activities related to the performance of this Agreement require specific licenses, <br />certifications, or related credentials Contractor represents that it and its employees, agents and <br />subcontractors engaged in such activities possess such licenses, certifications, or credentials <br />and that such licenses certifications, or credentials are current, active, and not in a state of <br />suspension or revocation. <br />g.The Contractor shall supervise and direct the Work efficiently and with the Contractor’s best <br />skill and attention. Except as specifically set forth in the Contract Documents the Contractor <br />shall be solely responsible for the means, methods, techniques, sequences and procedures of <br />construction, and for safety precautions and programs in connection with the Work. The <br />Contractor shall be responsible to see that the finished Work complies accurately with the <br />Contract Documents. <br />h.The Contractor shall appoint a competent Project Manager with general authority to manage <br />the Project for the Contractor. The Contractor shall also keep on the Project at a ll times during <br />the Work of the Contractor a competent Resident Superintendent and necessary assistants who <br />shall not be replaced without prior written approval by the Designer or by the Owner if a <br />Designer is not retained for the Project. <br />i.If, in the opinion of the Designer, any Subcontractor on the Project is incompetent or otherwise <br />unsatisfactory, such Subcontractor shall be replaced by the Contractor with no increase in the <br />Contract Price if and when directed by the Designer. <br />j.The Contractor shall attend all progress conferences and all other meetings or conferences. <br />The Contractor shall be represented at these progress conferences by a representative having <br />the authority of the Project Manager and by such other representatives as the Designer may <br />direct. <br />k.Costs and expenses of providing samples for and assistance in any testing shall be borne by the <br />Contractor. Any Work in which untested materials are used without written approval or <br />written permission of the Owner or Designer shall be removed and replaced at Contractor’s <br />expense. <br />l.The Contractor shall obtain all necessary permits including all permits required to complete the <br />Work in compliance with local, state, and federal law. <br />5.PAYMENT & TAXES <br />a.The Owner hereby agrees to pay to the Contractor for the faithful performance of this <br />Agreement, and the Contractor hereby agrees to perform all of the Work for a sum not-to- <br />exceed Three Hundred Fifty Six Thousand Five Hundred Fifty Four Dollars ($356554.00). <br />Not later than the fifth (5th) day of each calendar month the Contractor shall submit to the <br />Owner’s Representative, generally the Designer if a Designer is retained on the Work, a <br />Request for Payment for work done during the previous calendar month. <br />(i)The Request for Payment shall be in form of a standardized invoice or AIA Document <br />G702-703 appropriately addressed to Owner’s Representative at Orange County Attn: <br />Alan Dorman, PO Box 8181, Hillsborough NC 27278 and shall show substantially the <br />value of work done during the previous calendar month. <br />DocuSign Envelope ID: 4D47EA4B-60C5-48CF-AE0E-7E32377FCE26
The URL can be used to link to this page
Your browser does not support the video tag.