Browse
Search
2022-238-E-AMS-WB Brawley Company-Upfit WCOB 3rd Floor
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-238-E-AMS-WB Brawley Company-Upfit WCOB 3rd Floor
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2022 10:46:04 AM
Creation date
6/28/2022 10:45:31 AM
Metadata
Fields
Template:
Contract
Date
6/23/2022
Contract Starting Date
6/23/2022
Contract Ending Date
6/28/2022
Contract Document Type
Contract
Amount
$356,554.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised 06/21 1 <br />[Departmental Use Only] <br />TITLE WCOB UPFIT <br />FY 2022/23 <br />NORTH CAROLINA <br />CONSTRUCTION AGREEMENT OVER $250,000.00 <br />ORANGE COUNTY <br />THIS CONSTRUCTION AGREEMENT (hereinafter called “Agreement”), made as of the 23rd day <br />of June, 2022, by and between WB Brawley Company, (hereinafter called the “Contractor”), and Orange <br />County, a political subdivision of the State of North Carolina, (hereinafter called the “County,” “Orange <br />County,” or “Owner”). <br />W I T N E S S E T H: <br />That the Contractor and the Owner, for the consideration herein named, agree as follows: <br />1.CONTRACT DOCUMENTS; PRIORITY <br />The Contract Documents consist of this Agreement, the General Conditions which are fully <br />incorporated in this Agreement, the Request for Proposals, designer approved communications and field <br />orders, the Proposal, Construction Documents and Drawings and Written Specifications. The Contract <br />Documents form the Contract. In the event of a ny inconsistency between or among the Contract Documents <br />the Contract Documents shall be interpreted in the following order of priority: <br />a.This Agreement and incorporated General Conditions attached as Exhibit 1. <br />b.Designer approved and stamped construction documents and drawings and written <br />specifications. <br />c.Designer approved communications and field orders. <br />d.Request for Proposals and addenda thereto. <br />e.Proposal. <br />2.SCOPE OF WORK <br />The Contractor shall furnish and deliver all of the materials, and perform, and be fully responsible <br />for all of the Work required by this Agreement within the time period stipulated in a written Notice -to-Proceed <br />to be executed by the Contractor and Owner and in accordance with the following enumerated documents, <br />which are made a part hereof as if fully contained herein: <br />a.Construction Drawings prepared by HH Architecture (Sheet WEST CAMPUS OFFICE 3RD <br />FLOOR UPFIT dated 12/17/2021) <br />b.Written specifications prepared by the Designer. <br />c.West Campus Office Building 3rd Floor Upfit proposal dated May 12th, 2022 which fully <br />describes the work to be performed, such work (hereinafter called the “Work”). <br />DocuSign Envelope ID: 4D47EA4B-60C5-48CF-AE0E-7E32377FCE26
The URL can be used to link to this page
Your browser does not support the video tag.