Browse
Search
OTHER-2022-036-Stormwater operations and maintenance plan agreement
OrangeCountyNC
>
Board of County Commissioners
>
Various Documents
>
2020 - 2029
>
2022
>
OTHER-2022-036-Stormwater operations and maintenance plan agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2022 9:44:26 AM
Creation date
6/27/2022 9:38:26 AM
Metadata
Fields
Template:
BOCC
Date
6/21/2022
Meeting Type
Business
Document Type
Others
Agenda Item
8-l
Document Relationships
Agenda - 06-21-2022 Business Meeting
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1 : Inspection and Maintenance Provisions for Underground Detention <br /> • Check detention chambers and pipes for any obstructions , clogging, or damage . <br /> Remove accumulated grit, leaves, and debris and dispose off-site . <br /> Biannually • Remove any trash or debris present within the drainage area and outfall area . <br /> • Inspect the detention system for structural integrity and any accumulation of <br /> liquids or solids within the unit . <br /> • If the detention is in an area that is salted regularly during winter, the system <br /> Yearly should be rinsed during the springtime to prevent salting agents from <br /> accumulating inside the pipes . <br /> Structural Integrity <br /> • Repair any cracks , spalled areas , rusted areas within the detention chambers . <br /> • Replace any crushed or collapsed pipes under the supervision of a professional <br /> engineer . <br /> • Replace the detention structure if it has severely deteriorated . <br /> • Repair eroded outfall channels with additional riprap armoring or other <br /> permanent lining material . <br /> Functionality <br /> • Sediment Accumulation <br /> As Needed o Maintain stable ground cover in the drainage area . <br /> (Typical o Sweep or vacuum sediment on pavement in the contributing drainage area . <br /> Problems ) o Any accumulated sediment in the detention unit must be disposed to a <br /> waste handling facility . <br /> • Other Pollutants <br /> o Identify and eliminate any sources of excessive oil loading . <br /> o If clogging becomes a persistent issue that prevents drawdown , a trashrack <br /> is required on the discharge orifice within the underground detention <br /> structure . <br /> For additional information or if damage has occurred at the outlet which effects the <br /> receiving water, contact the Town at Chapel Hill Stormwater Management at 919 - <br /> 969 -7246 ( RAIN ) . <br />
The URL can be used to link to this page
Your browser does not support the video tag.