Browse
Search
2022-228-E-County Mgr-North State Communications Advanced Services-Broadband Initiative
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-228-E-County Mgr-North State Communications Advanced Services-Broadband Initiative
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 2:52:14 PM
Creation date
6/23/2022 2:50:47 PM
Metadata
Fields
Template:
Contract
Date
6/22/2022
Contract Starting Date
6/22/2022
Contract Ending Date
6/22/2022
Contract Document Type
Contract
Amount
$10,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />6 <br />and capability of the installed materials remains unchanged; and (iii) the change will <br />not result in a construction deviation of more than fifteen (15) days from the end of the <br />quarterly plan. In all other cases, including an actual or anticipated delay in the <br />construction schedule or a substantial modification to the Network map depicted in <br />Attachment A, Provider shall submit such modification and a detailed explanation for <br />the delay, as applicable. The County shall approve or deny such a proposed changed in <br />writing within seven (7) days. If the County fails to respond to such proposed <br />modification within thirty (30) days, the proposed change shall be deemed approved. <br /> <br />(ii) If, during construction, the County reasonably determines that a deviation from the <br />Construction Plan is desirable or appropriate, the County may submit a change request <br />in writing to Provider describing the nature of the proposed change. The Parties will <br />cooperate in good faith to address the additional cost and impact on the construction <br />timeline associated with the proposed change, if any. Provider may decline to <br />undertake the change, in its sole discretion. <br /> <br />e. Concealed or Unknown Conditions. If Provider encounters conditions at a site that it did <br />not detect through the exercise of commercially reasonable due diligence, and (1) the <br />conditions are sub-surface or otherwise concealed physical conditions that differ materially <br />from those reflected in the Construction Plan, or (2) the conditions are unknown physical <br />conditions of an unusual nature that differ materially from those ordinarily found to exist and <br />generally recognized as inherent in construction activities of the character provided for in the <br />Construction Plan, Provider shall promptly provide notice to County and in no event later than <br />21 days after first observance of the conditions. If County determines that the conditions differ <br />materially and will cause a material increase in time required by Provider to perform any part <br />of the work, and that Provider could not have identified the conditions by exercising <br />commercially reasonable due diligence prior to executing the Agreement, County will review <br />and approve an equitable adjustment to the time necessary to complete a milestone, as <br />applicable, provided such adjustment does not require obligation of County funds after <br />December 31, 2024 or completion of work after December 31, 2025. <br /> <br />f. No Funded Construction in RDOF Areas or to Served Locations. Under no circumstances <br />shall Provider utilize Subaward funds to construct network facilities to connect locations in <br />areas designated for support under the FCC Rural Digital Opportunity Fund, unless such <br />authority is provided to the County to fund these areas after the effective date of this <br />Agreement. Provider shall not utilize Subaward funds to connect locations which are not <br />unserved. <br /> <br />g. Easements and Rights of Use. <br />(i) At Provider’s sole cost and expense, Provider shall obtain from all state, local, and <br />federal jurisdictions, right-of-way owners, property owners, homeowners associations, <br />and other similar rights holders, all necessary easements and other applicable rights of <br />use upon those properties needed to construct, operate, and maintain the Network. <br />(ii) In the event that Provider is unable, despite commercially reasonable efforts, to obtain <br />the needed easements or rights of use from the property owners or other rights holders <br />in connection with a Location (such occurrence, a “Blocked Location”), Provider shall <br />use its best efforts to seek alternative means to ensure a Passing of all Locations <br />including the Blocked Locations. If alternative means are not available to it, Provider <br />shall notify County, and the Parties shall negotiate in good faith to devise a plan to <br />complete the Passing or modify the Work to delay those Locations that cannot be <br />DocuSign Envelope ID: 32FCA70F-8C9D-4D85-A0BE-B88413353B8B
The URL can be used to link to this page
Your browser does not support the video tag.