Browse
Search
Agenda - 06-21-2022; 8-l - Orange County Southern Campus Expansion Stormwater Operations and Maintenance Plan Agreement with Town of Chapel Hill (2501 Homestead Road, Chapel Hill)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2022
>
Agenda - 06-21-2022 Business Meeting
>
Agenda - 06-21-2022; 8-l - Orange County Southern Campus Expansion Stormwater Operations and Maintenance Plan Agreement with Town of Chapel Hill (2501 Homestead Road, Chapel Hill)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2022 2:27:20 PM
Creation date
6/16/2022 3:11:16 PM
Metadata
Fields
Template:
BOCC
Date
6/21/2022
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-l
Document Relationships
Agenda for June 21, 2022 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2022\Agenda - 06-21-2022 Business Meeting
Minutes 06-21-2022 Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 <br /> o Sweep or vacuum sediment on pavement in the contributing drainage <br /> area. <br /> o If sedimentation or clogging is occurring in the inlet, design modification <br /> may be needed to ensure adequate drop or slope between inlet and filter <br /> bed. <br /> o If sediment has accumulated in the forebay area or basin reducing its <br /> depth to 75%of the original design depth, remove the sediment, <br /> restabilize the area, and replace with clean rock. Search for the source of <br /> the sediment in the drainage area and remedy the problem if possible. <br /> • If greater than one feet of localized bed sinking and/or sediment is observed by <br /> the underdrain or overflow, conduct a test pit excavation by hand to examine <br /> subsurface conditions. Look for sediment across layers, discoloration,voids, loss <br /> of material. Cause of bed sinking may be breached material layers, poor <br /> connections, or damaged pipes. Repair the test pit to full functionality without <br /> cross contamination of the individual material layers. <br /> For additional information or if damage has occurred at the outlet which effects the <br /> receiving water, contact the Town at Chapel Hill Stormwater Management at 919- <br /> 969-7246 (RAIN). <br />
The URL can be used to link to this page
Your browser does not support the video tag.