Orange County NC Website
Attachment C 21 <br /> Orange County FTTP Project Schedule(6370 HHs) <br /> May-22 JUW22 Ju422 Aup22 8e►22 Oa622 1?1ar22 De 22 Jai Fa►23 Mar,23 Apn23 Map33 Juo-43 JuM Aug33 Sep-23 Oab33 16ew33 Du 23 Jaa@4 FM24 MardG Apn24 May-24 Jun24 Ju4TA AUF21 —7 <br /> Project Planning Plann[ngHe work <br /> Otrectar OSP _ <br /> Site Surveys <br /> Oire'OSP <br /> Easement Research <br /> orrl1 <br /> Design Engineer, Engneering <br /> DireRor OSP <br /> Permit Acquisition Engineering <br /> DireRor OSP <br /> MP Fiber Ruild Construction <br /> DireRor OSP <br /> Site Preparation Engineering <br /> DireRor lP <br /> Equip Installation Engineering <br /> DireRor OSP <br /> Fiber Terminal Installs&Splicing Construction <br /> DireRor. OSP <br /> Commercial Power A<[ivMion Engineering <br /> DirectorlP <br /> Equip Turn-op Engineering <br /> ors�IP&OSP) <br /> ng <br /> O ors SIP&05P) <br /> PM1au3 MarkH leumir 1+1,000 H.—) Engi—ni,g <br /> O ors SIP&OSP) <br /> Phase3 M.—Laonth(,1, mesh Engi eering <br /> Di"a.,SIP&OSP) <br /> Ph—4M-0 Laonth(11,000 Homes) EEi,eering <br /> ors(IP&OSP) <br /> uncb(a1,000 Homes) ring <br /> D ors SIP&OSP) <br /> Ph—6M.—U.-)e 1,3M Homes) Engi eering <br /> "'-JJ Schedule hazed on Signed Contract Ecec W by June W,2022 <br />