Orange County NC Website
Manager Recommended Fee Schedule - FY 2022-23 29 <br /> Last <br /> Department/Program Description Current Fee Revision <br /> Stream Origin and Intermittent/Perennial <br /> Determinations <br /> 1-2 determinations/site$300 <br /> 3-6 determinations/site$600 <br /> 7-9 determinations/site$1000 <br /> 10-12 determinations/site$1200 <br /> 13-16 determinations/site$1500 <br /> Surface Water Identification(SWID)field work. 17-19 determinations/site$2000 2021 <br /> Stop Work Order/Notice of Violation $200 per order 2021 <br /> Inspection fees <br /> Building <br /> Credit Card use fee 2%of transaction 2021 <br /> Schedule A <br /> New Residential(1&2 family) $0.394/sq.ft.(all trades included) 2018 <br /> Building 0.160/sq.ft./$110.00 Min 2018 <br /> Electrical 0.074/sq.ft./$110.00 Min 2018 <br /> Plumbing 0.074/sq.ft./ $110.00 2018 <br /> Mechanical 0.086/sq.ft./$110.00 2018 <br /> 0.0203/sq.ft.$25.00 min. 12%surcharge for <br /> Plan Review Hillsborough 2018 <br /> Schedule B <br /> Residential Renovations and Accessory Structures <br /> (1&2 family) $0.23 per square foot 2006 <br /> Building 0.293/sq.ft. 2018 <br /> Electrical $83.00 2018 <br /> Plumbing $83.00 2018 <br /> Mechanical $83.00 2018 <br /> 0.0203/sq.ft.$25.00 min. 12%surcharge for <br /> Plan Review Hillsborough 2018 <br /> Schedule C <br /> Mobile/Modular Homes <br /> Singlewide <br /> Building $110.00 2018 <br /> Electrical $70.00 2018 <br /> Plumbing $50.00 2018 <br /> Mechanical $50.00 2018 <br /> Doublewide <br /> Building $166.00 2018 <br /> Electrical $70.00 2018 <br /> Plumbing $50.00 2018 <br /> Mechanical $50.00 2018 <br /> Triplewide <br /> Building $193.00 2018 <br /> Electrical $70.00 2018 <br /> Plumbing $70.00 2018 <br /> Mechanical $70.00 2014 <br />