Browse
Search
Agenda - 06-21-2022; 6-a - Approval of Fiscal Year 2022-23 Budget Ordinances and County Fee Schedule
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2022
>
Agenda - 06-21-2022 Business Meeting
>
Agenda - 06-21-2022; 6-a - Approval of Fiscal Year 2022-23 Budget Ordinances and County Fee Schedule
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2022 2:59:38 PM
Creation date
6/16/2022 3:11:08 PM
Metadata
Fields
Template:
BOCC
Date
6/21/2022
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda for June 21, 2022 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2022\Agenda - 06-21-2022 Business Meeting
Minutes 06-21-2022 Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Manager Recommended Fee Schedule - FY 2022-23 28 <br /> Last <br /> Department/Program Description Current Fee Revision <br /> Erosion <br /> Control/Stormwater Erosion and Sedimentation Control Plan Review and <br /> Management Inspection Fees <br /> Residential and Non-Residential development: <br /> Less than 1 acre(43,560 sq.ft.)of land disturbance $125/$100 per acre lot(1) 2022 <br /> Residential development: <br /> Greater than 1 acre(43,560 sq.ft.)of land disturbance $150 per disturbed acre or fraction thereof 2021 <br /> Residential development: <br /> Greater than 25 acres of land disturbance $300 per disturbed acre or fraction thereof 2021 <br /> Non-Residential development: <br /> Greater than 1 acre(43,560 sq.ft)of land disturbance $300 per disturbed acre or fraction thereof 2021 <br /> Erosion Control Plan Revisions $150 per plan revision request 2021 <br /> Land Disturbing(Grading)Permits 2019 <br /> Less than 1 acre(43,560 sq.ft.)of land disturbance $300 flat fee <br /> 2021 <br /> Greater than 1 acre(43,560 sq.ft.)but less than 10 <br /> $300 per disturbed acre or fraction thereof <br /> acres of land disturbance <br /> 2021 <br /> Greater than 10 acres of land disturbance but less than $600 per disturbed acre or fraction thereof <br /> 25 acres of land disturbance 2021 <br /> Greater than 25 acres of land disturbance $900 per disturbed acre or fraction thereof,not <br /> to exceed 150 acres 2021 <br /> Unscheduled Site Re-Inspection $200 per re-inspection 2021 <br /> Private Roads $155.00 1998 <br /> Storm water Management Plans $500 per SCM 2019 <br /> Storm water Management Plan Review(LID) $300.00 2019 <br /> Conservation Area Document Review $200 per area 2019 <br /> Re-Inspection of Stormwater Control Measure(SCM) 1 st inspection no fee <br /> associated with a failed SCM inspection report $250 per SCM inspection thereafter 2021 <br /> Inspection of Stormwater Control Measure (SCM) <br /> associated with a Notice of Violation(NOV) $250 per SCM inspection 2021 <br /> Recurring 5-Year Inspection of Stormwater Control <br /> Measure(SCM) $750 per SCM 2021 <br /> At cost for legal ad and notifications to <br /> process if appealed to Public Hearing per UDO <br /> Appeal of Land Disturbing(Grading)Permit 2.26.8&9 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.