Browse
Search
Agenda - 06-21-2022; 8-l - Orange County Southern Campus Expansion Stormwater Operations and Maintenance Plan Agreement with Town of Chapel Hill (2501 Homestead Road, Chapel Hill)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2022
>
Agenda - 06-21-2022 Business Meeting
>
Agenda - 06-21-2022; 8-l - Orange County Southern Campus Expansion Stormwater Operations and Maintenance Plan Agreement with Town of Chapel Hill (2501 Homestead Road, Chapel Hill)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2022 2:27:20 PM
Creation date
6/16/2022 2:00:52 PM
Metadata
Fields
Template:
BOCC
Date
6/21/2022
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-l
Document Relationships
Agenda for June 21, 2022 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2022\Agenda - 06-21-2022 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
22 <br /> • Remediate bare soils or erosive gullies. <br /> o In perimeter areas, regrade the soil to remove the gully, plant a ground <br /> cover and water until it is established. If soil test shows that the pH has <br /> dropped, dolomitic lime shall be applied as recommended. <br /> o Within the pretreatment area, provide erosion control devices such as <br /> reinforced turf matting or riprap to avoid future problems with erosion. <br /> Structural integrity <br /> • Replace or repair any cracked, separated or damaged inlet pipes, outfalls, <br /> impoundment walls or other structural elements. <br /> • If dam embankment or emergency spillway needs maintenance, consult with a <br /> professional. <br /> Functionality <br /> • Sediment Accumulation <br /> o Maintain stable ground cover in the drainage area. <br /> o Sweep or vacuum sediment on pavement in the contributing drainage <br /> area. <br /> o If sedimentation or clogging is occurring in the inlet, design modification <br /> may be needed to ensure adequate drop or slope between inlet and <br /> filter bed. <br /> o If sediment has accumulated in the forebay area reducing its depth to <br /> 75%of the original design depth, remove the sediment off site, <br /> restabilize the area, and replace with clean rock. Search for the source <br /> of the sediment in the drainage area and remedy the problem if possible. <br /> • If there are visible disturbances to the forebay design, make the necessary <br /> repairs to ensure that the forebay is functioning as intended. <br /> • If evidence of a muskrat or beaver activity is observed, contact a professional to <br /> remove muskrat or beaver. <br /> • If the basin must be drained for an emergency or to perform maintenance,the <br /> flushing of sediment through the emergency drain should be minimized to the <br /> maximum extent practical. <br /> For additional information or if damage has occurred at the outlet which effects the <br /> receiving water, contact the Town at Chapel Hill Stormwater Management at 919- <br /> 969-7246 (RAIN). <br /> WETPOND PAGE 3 OF • • 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.