Browse
Search
2022-217-E-DEAPR-J Kester and Rose LLC General contractors-Change order
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-217-E-DEAPR-J Kester and Rose LLC General contractors-Change order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2022 8:04:43 AM
Creation date
6/10/2022 8:04:48 AM
Metadata
Fields
Template:
Contract
Date
6/9/2022
Contract Starting Date
6/9/2022
Contract Ending Date
6/9/2022
Contract Document Type
Contract
Amount
$0.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:440B99OA-4490-4F53-ACCC-3254D5399C9C <br /> Changer er <br /> JERNIGAN FESTER LLC Date: 6/7/2022 <br /> DE PR,Orange COLInty N <br /> dba J Kester & Rose Owner: Attn: Marabeth Carr <br /> 119 S. Fuquay Ave <br /> Contractor: Jernigan Kester LLC <br /> Fuquay Varina, NC 27526 <br /> Project name: Blackwood Farm Park Improvements <br /> Change order number: 004 <br /> Original Contract Date: 07/09/21 <br /> You are directed to make the following changes in this contract: <br /> I. Excavating rock within the right-of-way of Highway 86 for the turn lane as a component of the contract. <br /> 2. Extending the contract time to July 31,2022 for the guy wire relocation and window lead times as a component of the contract. <br /> 3, Revising the eaves at the Ranger Station and adding a custom built access door to include framing as a component of the contract. <br /> Cost breakdown for rock excavation at the proposed turn lane: Contract unit price for rock=$110 per CY. Rocl<quantified 110.2 CV <br /> Rock Excavation Cost:$1 10/CY x 110.2 cubic yards=$12,122, Overhead and Profit at 150/0=$1,818,30, Total Cost:$13.940.30 <br /> Cost bt°ealcdown for revising the construction of the eaves and adding an access door at the Ranger Station: Material=$1,240 <br /> Labor:(Eaves)=3 man crew x 5 hrs x$90/hr=$1,350,(Access Door)=3 men crew x 3 hrs x$90/hr=$810.OH/P=$510. Total Cost=$3,910 <br /> The original contract sum was: $2,801,660.00 <br /> Net amount of previous change orders: (18,171.75) <br /> Total original contract amount plus or minus net change orders: 2,801,660.00 <br /> Total amount of this change order: 17,850.30 (w/15% mark-up) <br /> The new contract amount including this change order will be: 2,801,660.00 <br /> The contract time will be changed by the following number of days: 52 days <br /> The date of completion as of the date of this change order is: 07/31/2022 <br /> Contractor: Owner: <br /> Ken Fain - Jernigan Kester LLC Marabeth Carr, Orange County Landscape Architect <br /> Company name Name <br /> H 9 S. Fuquay Ave 1020 US 70 West/ PO Box 8181 <br /> Address Address <br /> Fuquay Varina,NC 27526 Hillsborough NC 27278 <br /> City, State,Zip City, State,Zip <br /> 06/7/2022 <br /> Date Date <br /> 4, <br /> Signattu•e Signature <br />
The URL can be used to link to this page
Your browser does not support the video tag.