Browse
Search
ORD-2020-022 Ordinance Amending The Orange County Zoning Atlas
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2020-2029
>
2020
>
ORD-2020-022 Ordinance Amending The Orange County Zoning Atlas
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 12:17:35 PM
Creation date
6/2/2022 12:15:56 PM
Metadata
Fields
Template:
BOCC
Date
10/20/2020
Meeting Type
Business
Document Type
Ordinance
Agenda Item
6-a
Document Relationships
Agenda 10-20-20 Virtual Business Meeting
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2020\Agenda - 10-20-20 Virtual Business Meeting
Agenda - 10-20-20; 6-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2020\Agenda - 10-20-20 Virtual Business Meeting
Minutes 10-20-2020 Virtual Business Meeting
(Attachment)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
xiii . Buildings within the Project shall incorporate ` cool roof' systems into <br /> their design . The cool roof system is designed to deliver higher solar <br /> reflectance ( i . e . the ability to reflect the visible , infrared and ultraviolet <br /> wavelengths of the sun , reducing heat transfer to the building , etc . ) <br /> and higher thermal emittance (the ability to radiate absorbed , or non - <br /> reflected solar energy) than standard designed roofing products . <br /> xiv . Motion control activated lighting shall be , where safety and internal <br /> operations permit , used for all internal building lighting to prevent <br /> internal lights being left on indefinitely ; <br /> xv . Bio retention basins ( i . e . rain gardens ) shall be incorporated into the <br /> Project to capture and treat runoff from truck wells within proposed <br /> loading docks ; <br /> xvi . Low flow toilets and water fixtures shall be used within the Project for <br /> all restroom facilities and where not associated with a manufacturing <br /> or research process . <br /> d . Landscaping/Buffering : In addition to the standards contained in Section <br /> 6 . 8 of the UDO , the following specific standards shall apply to the Project : <br /> i . All required landscaping shall be installed and maintained by the <br /> developer or their successor in perpetuity ; <br /> ii . Existing vegetation shall be preserved in identified buffer areas as <br /> indicated on the approved master concept plan , including a 100 ft . <br /> perimeter buffer around external parcels zoned to an Orange County <br /> residential general use zoning designation . In those instances where <br /> foliage is disturbed or non -existent , landscaping shall be installed <br /> consistent with the following schematic : <br /> DECIDUOUS CANOPY ( 2 ) <br /> f ' EVERGREEN SHRUBS ( 10 ) <br /> EVERGREEN UNDERSTORY ( 5 ) <br /> EVERGREEN CANOPY ( 1 ) <br /> 4 <br /> t7yc 1 <br /> WA <br /> let <br /> 150400, <br /> NOTE , BUFFER TO BE PROVIDED IN AREAS WHERE <br /> EXISTING VEGETATION IS REMOVED . <br />
The URL can be used to link to this page
Your browser does not support the video tag.