Browse
Search
Agenda - 06-02-2022; 5 - Presentation from GoTriangle – Durham-Orange Light Rail Transit Expenditure Report
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2022
>
Agenda - 06-02-2022 Budget Public Hearing and Work Session
>
Agenda - 06-02-2022; 5 - Presentation from GoTriangle – Durham-Orange Light Rail Transit Expenditure Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2022 11:44:05 AM
Creation date
5/26/2022 11:43:03 AM
Metadata
Fields
Template:
BOCC
Date
6/2/2022
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
5
Document Relationships
Agenda for June 2, 2022 Budget & Capital Investment Plan Public Hearing & Work Session
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2022\Agenda - 06-02-2022 Budget Public Hearing and Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br /> • HDR was contracted for final design services related to the engineering <br /> phase of work. <br /> • This work included: <br /> o Field surveys and investigations, including exploration for subsurface <br /> utility engineering, inspections for hydraulic/drainage design, <br /> geotechnical borings, and seismic response tests. <br /> o Engineering plans and specifications, including the design of <br /> multiple bridges, aerial structures, and stations. <br /> o Environmental management, including mitigation monitoring plans <br /> and the evaluation of proposed changes to the design of the project. <br /> o Value engineering, which was required to mitigate potential project <br /> cost increases. <br /> ManagementDesign <br /> General Engineering Consultant <br /> HDR <br /> $86,.775.,632• • • <br /> HNTB Corporation is an employee-owned infrastructure solutions firm. HNTB provides professional <br /> services related to planning, design, program management, and construction management. HNTB has <br /> around 5,000 employees. Their headquarters is located in Kansas City, MO. In North Carolina, they have <br /> offices in Raleigh and Charlotte. At the time of the D-O LRT project, Henry V. Liles Jr. was HNTB's <br /> authorized representative and contract signatory. <br /> Learn more about HNTB on their website at https://www.hntb.com/about/. <br /> MW <br /> A • • i <br />
The URL can be used to link to this page
Your browser does not support the video tag.