Browse
Search
2022-204-E-IT Dept-NetPlanner Systems-Design changes and material cost increase for fiber optic infrastructure project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-204-E-IT Dept-NetPlanner Systems-Design changes and material cost increase for fiber optic infrastructure project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2022 10:12:04 AM
Creation date
5/25/2022 10:08:50 AM
Metadata
Fields
Template:
Contract
Date
5/23/2022
Contract Starting Date
5/23/2022
Contract Ending Date
5/24/2022
Contract Document Type
Contract
Amount
$46,200.39
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />2. Just to be clear on the 144 count fiber, it is my understanding that we will be <br />terminating 12 or 24 of the strands on each end into a patch panel, as indicated. The <br />remaining strands would be only tested, correct? This seemed unclear on the call, as it <br />was mentioned to terminate and test all, but only use rack space for those 12 or 24. <br /> <br />Northrup: 144 strands between 131 W. Margaret Lane and 1200 US -70 W. <br />A. All strands tested <br />B. Patch panels of the LC variety. <br />C. 131 W. Margaret to have 24 port patch panel with dedicated strands <br />showing up in a patch panel at 1200 US-70 W. <br />D. 131 W. Margaret to have 12 port patch panel with dedicated strands <br />showing up in a patch panel at 300 W. Tryon <br />E. 1200 US-70 to have 12 port patch panel with dedicated strands <br />showing up at a patch panel at 300 W. Tryon <br /> <br />By my count that is 36 dedicated strands of the 144 strand bundle. Thereby leaving 108 <br />strands tested yet dark. See Campus Wide Fiber and three original addresses project <br />and Alternate A for additional strand information. <br /> <br />Original and Campus Wide Fiber Project. North Campus Fiber Runs <br />Buildings DET to POB 12 strands - 6 single mode and 6 multi-mode patched at <br />each location. <br />Buildings DET to EAC 12 strands - 6 single mode and 6 multi-mode at each <br />location. <br /> <br />Alternate A Project. 131 W. Margaret Lane to Town of Hillsborough Addresses. <br /> 131 W. Margaret to 127 N Churton Street - 12 strands single mode patched at <br />each location. <br /> 127 N Churton Street to 101 E Orange Street - 12 strands single mode patched <br />at each location. <br /> 101 E Orange Street to 105 Corbin Street - 12 strands single mode patched at <br />each location. <br /> <br /> <br /> <br />3. There were several conduits mentioned during this call so I was hoping you could <br />include mapping showing the locations of these conduits as to where they are, what <br />size they are, and how long each conduit section is. <br /> <br />Northrup: See Item 1. <br /> <br />4. I would also like to ask for a scheduled site visit where the engineers from RiverStre et <br />Networks can ride this entire route and visit each location with someone familiar with <br />this project. <br /> <br />DocuSign Envelope ID: 78B556CA-C028-4315-8EF4-948059C1C6F0DocuSign Envelope ID: E0C7DD5C-4FA6-4C9E-85B9-3CA337445269
The URL can be used to link to this page
Your browser does not support the video tag.