Browse
Search
2022-204-E-IT Dept-NetPlanner Systems-Design changes and material cost increase for fiber optic infrastructure project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-204-E-IT Dept-NetPlanner Systems-Design changes and material cost increase for fiber optic infrastructure project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2022 10:12:04 AM
Creation date
5/25/2022 10:08:50 AM
Metadata
Fields
Template:
Contract
Date
5/23/2022
Contract Starting Date
5/23/2022
Contract Ending Date
5/24/2022
Contract Document Type
Contract
Amount
$46,200.39
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
West Campus(131 W. Margaret Ln.)Whitted HumanServices Bldg.(300 W. Tryon St.)North Campus(1200 US 70 W)1,500'960'1,680'3,280'580'3,500'131 W. Margaret Ln. Handhole (West Campus) to 1200 US 70 W Handhole (North Campus - 144 Strand Single Mode Fiber (Approx. 11,500 ')24 strands spliced intobuilding from handhole.6 strands spliced intobuilding from handhole.24 strands spliced intobuilding from handhole.HandholeHandholeHandhole18DocuSign Envelope ID: 78B556CA-C028-4315-8EF4-948059C1C6F0DocuSign Envelope ID: E0C7DD5C-4FA6-4C9E-85B9-3CA337445269
The URL can be used to link to this page
Your browser does not support the video tag.