Browse
Search
2022-204-E-IT Dept-NetPlanner Systems-Design changes and material cost increase for fiber optic infrastructure project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-204-E-IT Dept-NetPlanner Systems-Design changes and material cost increase for fiber optic infrastructure project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2022 10:12:04 AM
Creation date
5/25/2022 10:08:50 AM
Metadata
Fields
Template:
Contract
Date
5/23/2022
Contract Starting Date
5/23/2022
Contract Ending Date
5/24/2022
Contract Document Type
Contract
Amount
$46,200.39
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ID Task ModeTask NameDuration StartFinishPredecessors1Orange County, NC89 days?Tue 1/19/21Fri 5/21/212Engineering design and permitting4 wksTue 1/19/21Mon 2/15/213Project coordination and kick-off meeting(s)3 daysTue 2/16/21Thu 2/18/2124Clear for excavation4 wksFri 2/19/21Thu 3/18/2135Utilities located4 daysFri 3/19/21Wed 3/24/2146Directional Bore (2) 1 1/4" Conduits17 daysThu 3/25/21Fri 4/16/2157Place HHs along conduit path -every 1000' or less5 daysFri 4/9/21Thu 4/15/218Place locate wire along the conduit path17 daysThu 3/25/21Fri 4/16/219Drill Building and fit entrances with PVC to match bore pipe. 5 daysMon 4/19/21Fri 4/23/21610Pull fiber into existing network closets5 daysMon 4/26/21Fri 4/30/21911Terminate and test5 daysMon 5/3/21Fri 5/7/211012Walk-thru and close outs5 daysMon 5/10/21Fri 5/14/2111NovDecTaskSplitMilestoneSummaryProject SummaryInactive TaskInactive MilestoneInactive SummaryManual TaskDuration-onlyManual Summary RollupManual SummaryStart-onlyFinish-onlyExternal TasksExternal MilestoneDeadlineProgressManual ProgressPage 1Project: Project Schedule AR162Date: Fri 12/18/20Mon 1/25/21Mon 1/25/21Thu 2/25/21Thu 3/25/21Thu 5/27/2117DocuSign Envelope ID: 78B556CA-C028-4315-8EF4-948059C1C6F0DocuSign Envelope ID: E0C7DD5C-4FA6-4C9E-85B9-3CA337445269
The URL can be used to link to this page
Your browser does not support the video tag.