Browse
Search
2022-204-E-IT Dept-NetPlanner Systems-Design changes and material cost increase for fiber optic infrastructure project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-204-E-IT Dept-NetPlanner Systems-Design changes and material cost increase for fiber optic infrastructure project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2022 10:12:04 AM
Creation date
5/25/2022 10:08:50 AM
Metadata
Fields
Template:
Contract
Date
5/23/2022
Contract Starting Date
5/23/2022
Contract Ending Date
5/24/2022
Contract Document Type
Contract
Amount
$46,200.39
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PProject Timeline and <br />Methodology <br />The information in this document is proprietary & confidential. <br />Installation <br />The project schedule drives the project milestones and deadlines. Our project manager will remain in <br />close contact with Orange County Government representatives to keep everyone apprised of the <br />project status. <br />Written status reports will be provided on a weekly basis to confirm project progress. If any potential <br />issues surface that could jeopardize on-time completion, the project manager will make Orange County <br />Government representatives aware immediately so that resolution can be quickly implemented. <br />Certification and Testing <br />We pride ourselves on the quality of our finished project, including certification and testing of all <br />equipment installed by our highly qualified technical team. We thoroughly test each component of the <br />system according to manufacturer and industry guidelines to ensure the system is fully functional and <br />operating as expected. <br />Additional Services <br />In addition to hands-on installation services, a core group of personnel will support the project from <br />NetPlanner Systems’ project management office in Peachtree Corners to ensure a smooth execution: <br />Our senior project coordinator will process contract-related documents (including change <br />orders), hold an internal project kickoff meeting with all team members, make updated project <br />details accessible to all team members, and oversee invoicing to confirm compliance with <br />Orange County Government’s requirements. <br />NetPlanner’s procurement and logistics departments will work hand-in-hand to ensure smooth <br />material management from purchasing to staging to on-time delivery at each project site. <br />Our professional CAD experts are highly experienced in providing shop drawings, as-builts and <br />other integrated equipment documentation provided and installed by NetPlanner Systems. <br />Our pre- and post-construction coordinators are dedicated to providing timely submittals upon <br />project award and thorough closeout documents, which include test results, as-built drawings, <br />warranties, and O&M manuals, upon project completion. <br />Our management team is committed to the success of the project, and while they will not be <br />involved in the day-to-day activities, they will be provided with regular status updates and will <br />be available to assist immediately should any escalation be required. <br />16 <br />DocuSign Envelope ID: 78B556CA-C028-4315-8EF4-948059C1C6F0DocuSign Envelope ID: E0C7DD5C-4FA6-4C9E-85B9-3CA337445269
The URL can be used to link to this page
Your browser does not support the video tag.