Browse
Search
2022-204-E-IT Dept-NetPlanner Systems-Design changes and material cost increase for fiber optic infrastructure project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-204-E-IT Dept-NetPlanner Systems-Design changes and material cost increase for fiber optic infrastructure project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2022 10:12:04 AM
Creation date
5/25/2022 10:08:50 AM
Metadata
Fields
Template:
Contract
Date
5/23/2022
Contract Starting Date
5/23/2022
Contract Ending Date
5/24/2022
Contract Document Type
Contract
Amount
$46,200.39
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SScope of Work and <br />Technical Team <br /> <br /> <br />The information in this document is proprietary & confidential. <br /> <br /> <br />A large project locate will have to be called in for this size project. The first 5000ft will take 1 week after an <br />onsite meeting is done with the said contractor to clear for excavation. Then 3 to 4 days after said locating <br />time per 2000 to 3000ft to be located of existing utilities. <br /> <br /> All areas of non-hard pavement will be seed and strawed and or sod placed depending on the original <br />conditions at the time. <br /> <br />Final red lines will be present showing the location and depths of the said facility being installed after all work <br />and restoration have been completed. <br />Might be needed for project, owner provider <br />Equipment racks are not included in this proposal and are provided and installed by others. <br />Floor Cores and floor penetrations are not included in this proposal. <br />Overhead corridor basket tray or conduits inside buildings are not included in this proposal and is <br />provided by the electrical contractor. <br />Fire sleeves are not included in this proposal. <br />Fiber optic jumpers are not included in this proposal. <br />Active Network electronics, power strips, and UPS’s are not included in this proposal. <br />12 <br />DocuSign Envelope ID: 78B556CA-C028-4315-8EF4-948059C1C6F0DocuSign Envelope ID: E0C7DD5C-4FA6-4C9E-85B9-3CA337445269
The URL can be used to link to this page
Your browser does not support the video tag.