Browse
Search
2022-204-E-IT Dept-NetPlanner Systems-Design changes and material cost increase for fiber optic infrastructure project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-204-E-IT Dept-NetPlanner Systems-Design changes and material cost increase for fiber optic infrastructure project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2022 10:12:04 AM
Creation date
5/25/2022 10:08:50 AM
Metadata
Fields
Template:
Contract
Date
5/23/2022
Contract Starting Date
5/23/2022
Contract Ending Date
5/24/2022
Contract Document Type
Contract
Amount
$46,200.39
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SScope of Work and <br />Technical Team <br /> <br /> <br />The information in this document is proprietary & confidential. <br /> <br /> <br />SCOPE OF WORK <br /> <br />Please find our pricing for the following: <br />OSP Fiber Optic Backbone Cabling <br /> <br />Pricing is based on the following: <br />RFP 367-OC 5301 <br />Google Maps Images <br />Addendums 1, 2, 3, 4 & 5 <br /> <br /> <br />Structured Cabling System <br /> <br />Campus Wide Fiber Optic Backbone Cabling Scope Summary: <br />Provide and install (1) 144-Strand Singlemode OSP fiber between hand/manholes at 131 W. <br />Margaret Lane (West Campus) and 1200 US-70 West (Detention Center- North Campus). <br />Spliced 24-strands into the 144-strand fiber (above) for connectivity to 131 W. <br />Margaret Lane (West Campus). <br />Spliced 24-strands into the 144-strand fiber (above) for connectivity to 1200 US-70 <br />West (Detention Center- North Campus). <br />Provide and install (2) 6-Strand Singlemode OSP fiber from hand/manhole at North/South <br />Hassel St. to 300 W. Tryon St (Human Sciences Building). <br />(1) 6-strand will be spliced into the 144-strand fiber (above) for connectivity to 131 W. <br />Margaret Lane (West Campus). <br />(1) 6-strand will be spliced into the 144-strand fiber (above) for connectivity to 1200 <br />US-70 West (Detention Center- North Campus). <br />Provide and install fiber splice enclosures and associated hardware at each of the (3) <br />locations. <br />All fiber will be terminated with LC connectors in new fiber enclosures at each location. <br />Provide all testing, labeling, as-built, and support documentation as required per scope of <br />work. <br />Engineering and Design & Permitting is included. <br /> <br />Original and Campus Wide Fiber Optic Backbone Cabling (North Campus) Scope Summary: <br />Provide and install (1) 6-Strand Singlemode and (1) 6-strand multimode OSP fibers from MDF <br />in 1200 US-70 West (Detention Center- North Campus) to: <br />IDF in Parks Operations Base (POB) <br />IDF in Environmental and Agricultural (EAC) <br />All fiber will be terminated with LC connectors in new fiber enclosures at each location. <br />10 <br />DocuSign Envelope ID: 78B556CA-C028-4315-8EF4-948059C1C6F0DocuSign Envelope ID: E0C7DD5C-4FA6-4C9E-85B9-3CA337445269
The URL can be used to link to this page
Your browser does not support the video tag.