Browse
Search
2022-204-E-IT Dept-NetPlanner Systems-Design changes and material cost increase for fiber optic infrastructure project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-204-E-IT Dept-NetPlanner Systems-Design changes and material cost increase for fiber optic infrastructure project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2022 10:12:04 AM
Creation date
5/25/2022 10:08:50 AM
Metadata
Fields
Template:
Contract
Date
5/23/2022
Contract Starting Date
5/23/2022
Contract Ending Date
5/24/2022
Contract Document Type
Contract
Amount
$46,200.39
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> <br /> <br /> <br />Finance Services Department – Purchasing Division <br /> <br />Bid Addendum #3: Updates and Important Reminders <br /> <br />December 9, 2020 <br /> <br />ORANGE COUNTY RFP No 367-OC 5301 <br />OUTSIDE PLANT FIBER OPTIC INFRASTRUCTURE - 2020 <br />Site to Site Connections <br />131 W. Margaret Lane, Hillsborough, NC 27278, <br />1200 US-70 W, Hillsborough NC 27278 <br />300 W. Tryon Street, Hillsborough, NC 27278 <br />Campus Wide Fiber and Alternate A <br /> <br />Please see updates based on a site visit conducted by Jim Northrup, Orange County Chief <br />Information Officer, with a potential bidder on December 3, 2020. <br /> <br />Potential fiber paths along 131 W. Margaret Lane and 300 W. Tryon Street: <br /> <br />The IT and the Facilities department came to the conclusion that there are 2” – 4” conduits partially <br />occupied in a handhold marked CATV along to the east side of Margaret Lane-West Campus <br />entrance. For example, the NE corner of the property. These conduits enter the West Campus <br />Office Building below grade on the east wall into and above the ceiling area of Floor 0 where there <br />are pull boxes and continue from said pull boxes on to the 3rd floor Data Center. <br /> <br />Important Reminders: <br /> <br />Sealed proposals will be received until 3:00 pm on December 18, 2020 in the office of <br />Orange County Financial/Administrative Services, 405 Meadowlands Drive, Hillsborough, NC <br />27278, Attn: Jovana Amaro, Purchasing Agent. <br /> <br />Please be aware that there is not a public bid opening scheduled for this solicitation. A bid <br />tabulations file will be sent on December 22, 2020 to all the firms that participated in the mandatory <br />pre-submittal virtual conference on November 13, 2020. <br /> <br />Critical updated information may be included in Addenda to this RFP. It is important that all <br />Vendors proposing on this RFP periodically check the State’s IPS website and Orange County’s <br />website for any Addenda that may be issued prior to the bid opening date. All Vendors shall be <br />deemed to have read and understood all information in this RFP and all Addenda thereto. <br /> <br />All qualified proposals will be evaluated, and awards will be made to the Vendor(s) meeting the <br />RFP requirements and achieving the highest and best final evaluation, based on the criteria <br />described in the RFP. <br /> <br />End of Addendum 3. <br />Attachment 4DocuSign Envelope ID: 78B556CA-C028-4315-8EF4-948059C1C6F0DocuSign Envelope ID: E0C7DD5C-4FA6-4C9E-85B9-3CA337445269
The URL can be used to link to this page
Your browser does not support the video tag.