Browse
Search
2022-204-E-IT Dept-NetPlanner Systems-Design changes and material cost increase for fiber optic infrastructure project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-204-E-IT Dept-NetPlanner Systems-Design changes and material cost increase for fiber optic infrastructure project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2022 10:12:04 AM
Creation date
5/25/2022 10:08:50 AM
Metadata
Fields
Template:
Contract
Date
5/23/2022
Contract Starting Date
5/23/2022
Contract Ending Date
5/24/2022
Contract Document Type
Contract
Amount
$46,200.39
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> <br />9) Same section, can you clarify what type of information is required in the response for <br />“Project Organization”? <br /> <br />Elaborate on your team organization identifying the roles and responsibilities of all team <br />members including an identification of the project manager, key personnel that will be <br />working on the project, and the role of any proposed firms that will be part of your team. <br />10) Under Section 5.1, the specification calls for single mode fiber optic (SMFO) cable to <br />have yellow jacket. Early indications from Corning on the Altos cable called out in the <br />spec are 32 weeks lead time for the standard outdoor cable, which has black jacketing, <br />they will not commit a lead time to custom orders. Will standard jacket color be <br />acceptable on the SMFO cable, as long as the performance spec is met? <br /> <br />Standard jacket color will be acceptable. <br /> <br />11) Same section 5.1, with the multi-mode fiber (MMFO) cable proposed to be added for the <br />Campus wide cabling, will there be any spec details provided for the MMFO cable, and <br />will the jacket color also be specified as other than black? <br /> <br />No. <br /> <br />12) In regards to the building terminations, does or will Orange County have in place the <br />racks and termination panels for each locations to terminate the fiber in? <br /> <br />Standard two post racks with vertical and horizontal wire management will be <br />provided. Patch panels will be provided and spec’d by the bidder. <br /> <br />13) Can the County provide any other details on the building entry points for each location, <br />such as where on the building, and whether the entry point is aerial or underground? <br /> <br />1200 US HWY 70 - (see Addendum 1) <br />300 W. Tryon – Any entry point into that facility would be new, i.e., included in <br />this proposal. <br />131 W. Margaret Lane - Any entry point into that facility would be new, i.e., <br />included in this proposal. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />DocuSign Envelope ID: 78B556CA-C028-4315-8EF4-948059C1C6F0DocuSign Envelope ID: E0C7DD5C-4FA6-4C9E-85B9-3CA337445269
The URL can be used to link to this page
Your browser does not support the video tag.