Browse
Search
2022-204-E-IT Dept-NetPlanner Systems-Design changes and material cost increase for fiber optic infrastructure project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-204-E-IT Dept-NetPlanner Systems-Design changes and material cost increase for fiber optic infrastructure project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2022 10:12:04 AM
Creation date
5/25/2022 10:08:50 AM
Metadata
Fields
Template:
Contract
Date
5/23/2022
Contract Starting Date
5/23/2022
Contract Ending Date
5/24/2022
Contract Document Type
Contract
Amount
$46,200.39
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> <br /> <br /> <br /> <br />Finance Services Department – Purchasing Division <br /> <br />Bid Addendum #2: Answer to Questions <br /> <br />November 30, 2020 <br /> <br />ORANGE COUNTY RFP No 367-OC 5301 <br />OUTSIDE PLANT FIBER OPTIC INFRASTRUCTURE - 2020 <br />Site to Site Connections <br />131 W. Margaret Lane, Hillsborough, NC 27278, <br />1200 US-70 W, Hillsborough NC 27278 <br />300 W. Tryon Street, Hillsborough, NC 27278 <br />Campus Wide Fiber and Alternate A <br /> <br /> <br /> <br />Please see the following questions and responses below. <br /> <br />1) General question – is there a budget for this project? <br /> <br />Yes. This project will be funded from existing funds earmarked for fiber expansion. <br /> <br />2) On the addendum the “Proposal Contents – Revised” is shown as 2.6, but on the original <br />posting, it was 2.7. Is this just a typo, or was section 2.6 eliminated? <br /> <br /> It is a typo. Section 2.6 has not been eliminated. <br /> <br />3) For the Proposal submittal in section 2.6, for “office delivery”, will the County receive <br />hand delivery by a vendor/firm at the 405 Meadowlands office listed, or does that <br />delivery method need to be made by a carrier such as DHL, FedEx, etc.? <br /> <br />It is preferable that vendors use the proposal submittal methods listed on page 5. <br />However, vendors will have the option to hand deliver their proposals on December 18, <br />2020 from 12:00 pm until 3:00 pm at 405 Meadowlands Drive, Hillsborough, NC 27278. <br /> <br />4) On page 6, but in general since this is a hard copy submittal, are the signatures required <br />on documents for this proposal all to be “wet” signatures, or will electronic signatures be <br />acceptable? <br /> <br />Both electronic and “wet” signatures will be acceptable for Attachment B: Certification of <br />Financial Condition and Attachment C: Addendum Acknowledgement. However, the E- <br />verify form shall be completed and notarized. <br /> <br />Attachement 3 <br />DocuSign Envelope ID: 78B556CA-C028-4315-8EF4-948059C1C6F0DocuSign Envelope ID: E0C7DD5C-4FA6-4C9E-85B9-3CA337445269
The URL can be used to link to this page
Your browser does not support the video tag.