Browse
Search
2022-204-E-IT Dept-NetPlanner Systems-Design changes and material cost increase for fiber optic infrastructure project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-204-E-IT Dept-NetPlanner Systems-Design changes and material cost increase for fiber optic infrastructure project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2022 10:12:04 AM
Creation date
5/25/2022 10:08:50 AM
Metadata
Fields
Template:
Contract
Date
5/23/2022
Contract Starting Date
5/23/2022
Contract Ending Date
5/24/2022
Contract Document Type
Contract
Amount
$46,200.39
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
long-term goals of potentially using the 10-inch PVC as a future fiber optic conduit. I <br />will confirm status as we move forward. <br /> <br />I was referring to the section from New Hill Ave to the jail site. Permits may take <br />longer than your contract time. <br /> <br />14. Will the maps for the sewer line be provided an Addendum? <br /> <br />Northrup: See Item 7. <br /> <br />15. Do you have any specific requirements on the fiber? <br /> <br />Northrup: Other than what it is in the RFP and the addenda, no. <br /> <br />16. Will you outline all of these fiber placement details in the addendum? Just trying to <br />figure out how we can try to build a bill of materials for the quoting. <br /> <br />Northrup: Other than the drawings provided and any site visit requests, no. Vendors <br />are requested to provide a total cost for each project. We have eliminated the <br />requirement to provide materials and labor. <br /> <br /> <br />17. Did you say the jail at 1200 US-70 is a new build? <br /> <br />Northrup: Yes. <br /> <br /> <br />18. Will this meeting recording be available and shareable? <br /> <br />No, it will not. We will be posting an addendum with the answers to all questions <br />received during the Pre-bid meeting. Also, vendors have an additional opportunity to <br />submit questions by November 20, 2020. <br /> <br /> <br />19. Are you looking to access other spare strands of the 144 fiber cable later to branch <br />off to other buildings at a later date? Anywhere along the 144 route? I would think <br />direct bury would not be the way to go and have it in conduit and handholes to <br />access and splice into the 144. <br /> <br />Northrup: There are no specific plans other than what is stated. <br /> <br /> <br />20. In the downtown area, are there any existing communications conduits or duct banks <br />running around town or near the 2 address locations to maybe head towards the <br />sewer main available to use? <br /> <br />DocuSign Envelope ID: 78B556CA-C028-4315-8EF4-948059C1C6F0DocuSign Envelope ID: E0C7DD5C-4FA6-4C9E-85B9-3CA337445269
The URL can be used to link to this page
Your browser does not support the video tag.