Browse
Search
2022-204-E-IT Dept-NetPlanner Systems-Design changes and material cost increase for fiber optic infrastructure project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-204-E-IT Dept-NetPlanner Systems-Design changes and material cost increase for fiber optic infrastructure project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2022 10:12:04 AM
Creation date
5/25/2022 10:08:50 AM
Metadata
Fields
Template:
Contract
Date
5/23/2022
Contract Starting Date
5/23/2022
Contract Ending Date
5/24/2022
Contract Document Type
Contract
Amount
$46,200.39
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Northrup: Contact Jim Northrup @ jnorthrup@orangecountync.gov, 919-245-2276(o) <br />or 252-305-6678(c) <br /> <br />5. If we chose to go aerial for part or all of the route, who will be responsible for the <br />permitting and associated fees for that? <br /> <br />Northrup: Successful Bidder <br /> <br />6. Will you be pulling the permits for the DOT sections and providing local jurisdiction <br />permits along the route? <br /> <br />Northrup: Orange County will facilitate DOT and local jurisdiction permitting, but the <br />successful bidder is responsible for all permits. <br /> <br />7. Will the map from today’s meeting of the sewer line be provided? <br /> <br />Northrup: Yes. See Hazen and Sawyer – Drawings –Job Number 3600 <br /> <br />8. Will an interior design for the buildings we are starting at or terminating in be <br />provided? <br /> <br />Northrup: See item 1. Beyond that estimations or site visits may be necessary. <br /> <br />9. Are we able to do a site survey of the buildings we are entering? <br /> <br />Northrup: Yes. See Item 4 for access information. <br /> <br />10. What are testing specs of the fiber cable? OTDR, iOLM, SOR, Power Meter? <br /> <br />Northrup: Bidder to provide. <br /> <br />11. What are allowable work hours for the project on working days? <br /> <br />Ardnt: 7 AM to 5 PM extended hours can be negotiated. <br /> <br />12. Will the sewer main remain empty in the future for all time? <br /> <br />Christopher Sandt: Yes, it is abandoned in perpetuity in terms of usage as a sewer <br />force main. The abandoned/cleaned/disinfected force main is a 10-inch PVC <br /> <br />13. So has the encroachment permit been secured from NCDOT for the section along <br />US 70? <br /> <br />Christopher Sandt: I believe our existing encroachment agreement for the force main <br />remains in place and is in good standing, NCDOT is aware that Orange County has <br />DocuSign Envelope ID: 78B556CA-C028-4315-8EF4-948059C1C6F0DocuSign Envelope ID: E0C7DD5C-4FA6-4C9E-85B9-3CA337445269
The URL can be used to link to this page
Your browser does not support the video tag.