Orange County NC Website
s <br /> 5 <br /> Attachment 2 <br /> Options for Board Action <br /> A. Process all applications that have been submitted by March 6, 2002 to <br /> include the following: <br /> 1. Board action on SUP <br /> 2. Administrative action on approved SUP <br /> 3. Zoning compliance permit for building permits <br /> B. Do not accept any applications within the six month moratorium for: <br /> 1. All new tower structures <br /> 2. Including antennae attachments to existing <br /> a. teleco poles <br /> b. power poles <br /> [Note:up to 20'or 10% of existing tower(whichever is greater)] <br /> C. other structures <br /> 3. Towers 75' and less. <br /> 4. Co-locations of telecommunications equipment on existing towers. <br /> C. Accept application for co-locations on existing towers. <br /> D. Exclude towers 75' and less and proposals to attach to structures from the <br /> moratorium. <br />