Browse
Search
Agenda 05-24-22; 7-a - Orange County Facilities Master Planning Presentation
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2022
>
Agenda - 05-24-2022 Business Meeting
>
Agenda 05-24-22; 7-a - Orange County Facilities Master Planning Presentation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2022 3:17:39 PM
Creation date
5/19/2022 3:20:24 PM
Metadata
Fields
Template:
BOCC
Date
5/24/2022
Meeting Type
Business
Document Type
Agenda
Agenda Item
7-a
Document Relationships
Agenda for May 24, 2022 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2022\Agenda - 05-24-2022 Business Meeting
Minutes 05-24-2022 Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br /> OBIA <br /> O'BRIEN ATKINS <br /> O'Brien/Atkins proposes the following team for this project: <br /> Base Services: <br /> O'Brien Atkins will provide the following Master plan services: Project Management, Space Needs, <br /> Benchmarking, Space Projections, Leasing and Disposition of Real Estate, Land Planning, <br /> Architectural Concept Design and Order of Magnitude Cost Estimating. <br /> • OBA—project lead, Land Planner and Architectural designer <br /> • CGL—Space Planner <br /> • CBRE—Real Estate Lease Evaluations <br /> • Palacio Collaborative—Order of Magnitude Cost Estimating <br /> Supplemental Team members if needed: <br /> • Terracon—Environmental/Mold,Asbestos and Indoor Air Quality <br /> 6. Clarifications <br /> • Site surveys are not included <br /> • Site and Building Environmental studies are not included <br /> • Geothermal well evaluation is not included <br /> • Traffic or Transportation analysis and planning is not included <br /> • Detailed design plans or permitting plans are not included <br /> I <br /> 7. Proposed Fees <br /> O'Brien Atkins proposes to provide the Scope of Design Services outlined in this proposal. A summary of <br /> the fee by phase is as follows: <br /> Base Services <br /> Task 1 -Visioning $19,490 <br /> Task 2-Investigation $21,450 <br /> Task 3-Space Needs Analysis $72,805 <br /> Task 4-Conceptual Planning and Design $98,170 <br /> Task 5-Communication&Presentations $39,720 <br /> Task 6-Documentation $46,580 <br /> Total Fee$298,215 <br /> The total fee is Two Hundred Ninety-Eight Thousand Two Hundred Fifteen Dollars($298,215). Direct <br /> reimbursable expenses are included in the fee named above. <br /> PwA 011 ice 13ox 110;7 I kes(:rlf d I I IianPlc Park, IOW 709 <br /> P6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.