Browse
Search
Agenda 05-24-22; 7-a - Orange County Facilities Master Planning Presentation
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2022
>
Agenda - 05-24-2022 Business Meeting
>
Agenda 05-24-22; 7-a - Orange County Facilities Master Planning Presentation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2022 3:17:39 PM
Creation date
5/19/2022 3:20:24 PM
Metadata
Fields
Template:
BOCC
Date
5/24/2022
Meeting Type
Business
Document Type
Agenda
Agenda Item
7-a
Document Relationships
Agenda for May 24, 2022 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2022\Agenda - 05-24-2022 Business Meeting
Minutes 05-24-2022 Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> OBIA <br /> O'BRIEN ATKINS <br /> o Projections Database <br /> ■ Using data obtained from the completed survey instruments and detailed <br /> interviews,the consultant will develop a projections database for the County. <br /> ■ The first database component will be to prepare a projection of future <br /> personnel requirements for each staff-driven department.The projections will <br /> quantify changes in personnel in five-year increments up to 20 years,The <br /> personnel projections will consider official County population forecasts, historic <br /> trends, and agency-specific workload factors indicative of the functions <br /> performed. For departments that are not staff-driven,the consultant will <br /> identify the impacting growth factor and project the unit need in five year <br /> increments for 20 years. <br /> ■ Using the unit projection (staff or other) and recommended department space <br /> standard (DGSF/unit),the consultant will calculate total DGSF required for each <br /> department in five-year increments for 20 years.Space projections will be at a <br /> department gross level to develop block space needs for options development. <br /> o Gap Analysis <br /> ■ The consultant will identify the gaps between existing facilities and the overall <br /> ability to meet current and future space projections.The analysis of the current <br /> state to future needs will identify the facility gaps and the opportunities for <br /> future development. <br /> Task 4-Conceptual Planning& Design <br /> o Prepare 3 planning concepts that accommodate the space needs identified <br /> ■ Phasing plans for short, mid and long-range plans <br /> ■ Refine plans in work sessions with County and select a preferred option <br /> o Real estate broker overview of existing County owned facilities <br /> ■ Broker opinion of values for the following County owned facilities identified in <br /> the RFP that have been relocated to new facilities or temporarily vacated due to <br /> unsafe building conditions(i.e., mold). <br /> o Dept of Environment&Agricultural Services <br /> o Detention Facilities <br /> o Public Defender Building <br /> o John Link Government Services Center <br /> ■ Identification of relocations sites for potential future construction and/or lease. <br /> ■ Review status of current leases <br /> o Cost analysis Pro's&Cons of owned versus leased scenarios <br /> o Potential remote work strategies <br /> ■ Conceptual design of a new County Administration facility <br /> Oi`ri(,e mx "I)w 1 I ch "I riaul;Io Perk, IMC: ( 77709 <br /> 91'MM 1,9 00 w�n�w.ul��l; n�iki�irs,<,orn <br /> P14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.