Orange County NC Website
21 <br /> I.The credit requires that the stated thresholds are achieved in the most recent reporting year, which is 2020 <br /> for the project as mentioned in the Quality-of-Life Performance prerequisite.The COVID-19 pandemic impacted <br /> the global economy to a great extent therefore the strategy has been awarded despite the increase in <br /> unemployment in 2020, which is outside the acceptable threshold of 3%-4%. <br /> Distributional Equity Awarded: 2 <br /> POSSIBLE POINTS:4 <br /> ATTEMPTED: 2, NOT AWARDED:0, PENDING:0,AWARDED: 2 <br /> 11/29/2021 EXISTING PRELIMINARY REVIEW <br /> Option 2b.Graduation Rate Equity <br /> Awarded <br /> Option 4.Access&Proximity <br /> Awarded <br /> Environmental Justice Awarded: 1 <br /> POSSIBLE POINTS: 1 <br /> ATTEMPTED: 1, NOT AWARDED:0, PENDING:0,AWARDED: 1 <br /> 11/29/2021 EXISTING PRELIMINARY REVIEW <br /> Awarded <br /> Housing and Transportation Affordability Awarded:2 <br /> POSSIBLE POINTS:2 <br /> ATTEMPTED:2, NOT AWARDED:0, PENDING:0,AWARDED:2 <br /> 11/29/2021 EXISTING PRELIMINARY REVIEW <br /> Option 1. Comprehensive Housing Policy <br />