Orange County NC Website
<br /> <br />Cost proposal for additional work shall be accompanied by revised project scheduled changes, if schedule is <br />impacted. Failure to provide revised schedule will result in no ch anges to existing schedule. Schedule <br />considerations are only applicable to critical path items when no float time is available. Shared float time shall <br />be assigned to proposed work items per contract documents section 013200. <br /> <br />719 E. Second Avenue, Gastonia, NC 28054 P: 704-865-6311 F: 704-865-0046 <br />Cost provided shall include all labor, material, equipment, services and supplies. General Contractor and/or <br />subcontractor shall perform all work in accordance with bid Documents and/or instructions provided by <br />architect post bid. <br /> <br /> <br />May 4, 2022 <br /> <br />Orange County - Asset Management Services <br />300 West Tryon Street | Bldg. B 3rd Floor Office 10 <br />Hillsborough, NC 27278 <br /> <br />Attn: Angel Barnes <br /> Capital Projects Manager <br /> <br />Re: Orange County EMS and Medical Examiners Quarters – Fee Amendment <br /> <br /> <br />At the request of Orange County, the above-captioned project shall include Building Systems <br />Commissioning for Plumbing, Mechanical and Electrical systems, including photovoltaics. <br /> <br />Stewart Cooper Newell requests a fee amendment to cover the additional scope associated with <br />Building Systems Commissioning. <br /> <br /> <br />Our proposed fee for performing Building Systems Commissioning is as follows: <br /> <br />Building Systems Commissioning for Plumbing, Mechanical and Electrical systems, including <br />photovoltaics: <br /> $21,160 <br /> Plus Reimbursable <br /> <br />Please advise when the proposal is approved as the Construction Administration schedule will require <br />revisions. <br /> <br />Thank you, <br /> <br />Sincerely, <br />James R. Stumbo, AIA <br /> <br /> <br />DocuSign Envelope ID: 20812573-55BA-407F-AFD7-4AFC4813F7C4