Orange County NC Website
<br />Revised 06/21 <br /> <br /> <br />4 <br />and that such licenses certifications, or credentials are current, active, and not in a state of <br />suspension or revocation. <br /> <br />g. The Contractor shall supervise and direct the Work efficiently and with the Contractor’s best <br />skill and attention. Except as specifically set forth in the Contract Documents the Contractor <br />shall be solely responsible for the means, methods, techniques, sequences and procedures of <br />construction, and for safety precautions and programs in connection with the Work. The <br />Contractor shall be responsible to see that the finished Work complies accurately with the <br />Contract Documents. <br /> <br />h. The Contractor shall appoint a competent Project Manager with general authority to manage <br />the Project for the Contractor. The Contractor shall also keep on the Project at all times during <br />the Work of the Contractor a competent Resident Superintendent and nec essary assistants who <br />shall not be replaced without prior written approval by the Designer or by the Owner if a <br />Designer is not retained for the Project. <br /> <br />i. If, in the opinion of the Designer, any Subcontractor on the Project is incompetent or otherwise <br />unsatisfactory, such Subcontractor shall be replaced by the Contractor with no increase in the <br />Contract Price if and when directed by the Designer. <br /> <br />j. The Contractor shall attend all progress conferences and all other meetings or conferences. <br />The Contractor shall be represented at these progress conferences by a representative having <br />the authority of the Project Manager and by such other representatives as the Designer may <br />direct. <br /> <br />k. Costs and expenses of providing samples for and assistance in any testing shall be borne by the <br />Contractor. Any Work in which untested materials are used without written approval or <br />written permission of the Owner or Designer shall be removed and replaced at Contractor’s <br />expense. <br /> <br />l. The Contractor shall obtain all necessary permits including all permits required to complete the <br />Work in compliance with local, state, and federal law. <br /> <br />5. PAYMENT & TAXES <br /> <br />a. The Owner hereby agrees to pay to the Contractor for the faithful performance of this <br />Agreement, and the Contractor hereby agrees to p erform all of the Work for a sum not-to- <br />exceed Five Million, Five Hundred Sixty Four, Three Hundred Nineteen Dollars <br />($5,564,319.00). Not later than the fifth (5th) day of each calendar month the Contractor shall <br />submit to the Owner’s Representative, generally the Designer if a Designer is retained on the <br />Work, a Request for Payment for work done during the previous calendar month. <br /> <br />(i) The Request for Payment shall be in form of a standardized invoice or AIA Document <br />G702-703 appropriately addressed to Owner’s Representative at Stewart-Cooper- <br />Newell Architects, 712 E. Second Ave., Gastonia, NC 28054 and shall show <br />substantially the value of work done during the previous calendar month. <br /> <br />(ii) The amount due for payment shall be ninety-five percent (95%) of the value of work <br />completed since the last Request for Payment and this amount shall be paid by the <br />DocuSign Envelope ID: 40CF07BE-0F08-4B66-B4FD-884A0A07C01CDocuSign Envelope ID: D14CEB36-3A5D-4960-8FE4-C29D1FBF03AD