Browse
Search
2022-189-E-AMS-Jernigan Kester LLC dba J Kester & Rose-Efland EMS Station and Medical Examiners Quarters
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-189-E-AMS-Jernigan Kester LLC dba J Kester & Rose-Efland EMS Station and Medical Examiners Quarters
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2022 8:23:00 AM
Creation date
5/18/2022 8:22:50 AM
Metadata
Fields
Template:
Contract
Date
5/16/2022
Contract Starting Date
5/16/2022
Contract Ending Date
5/18/2022
Contract Document Type
Contract
Amount
$5,565,319.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Revised 06/21 <br /> <br /> <br />1 <br /> [Departmental Use Only] <br /> TITLE Efland EMS & ME <br /> FY 2021-2022 <br />NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT OVER $250,000.00 <br />ORANGE COUNTY <br /> <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called “Agreement”), made as of the 4th day of <br />May, 2022, by and between Jerrigan Kester, LLC dba J. Kester & Rose, (hereinafter called the “Contractor”), <br />and Orange County, a political subdivision of the State of North Carolina, (hereinafter called the “County,” <br />“Orange County,” or “Owner”). <br /> <br /> <br />W I T N E S S E T H: <br /> <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> <br />1. CONTRACT DOCUMENTS; PRIORITY <br /> <br /> The Contract Documents consist of this Agreement , the General Conditions which are fully <br />incorporated in this Agreement, the Request for Proposals, designer approved communications and field <br />orders, the Proposal, Construction Documents and Drawings and Written Specifications. The Contract <br />Documents form the Contract. In the event of a ny inconsistency between or among the Contract Documents <br />the Contract Documents shall be interpreted in the following order of priority: <br /> <br />a. This Agreement and incorporated General Conditions attached as Exhibit 1. <br /> <br />b. Designer approved and stamped construction documents and drawings and written <br />specifications. <br /> <br />c. Designer approved communications and field orders. <br /> <br />d. Request for Proposals and addenda thereto. <br /> <br />e. Proposal. <br /> <br />2. SCOPE OF WORK <br /> <br /> The Contractor shall furnish and deliver all of the materials, and perform, and be fully responsible <br />for all of the Work required by this Agreement within the time period stipulated in a written Notice -to-Proceed <br />to be executed by the Contractor and Owner and in accordance with the following enumerated documents, <br />which are made a part hereof as if fully contained herein: <br /> <br />a. Construction Drawings prepared by Stewart-Cooper-Newell Architects (Sheet 0.00 Cover <br />Sheet, 1.00 Apendix B, 1.10 Life Safety Plan, 1.70 Wall Types, 1.71 UL Detail & Assembly <br />Types, C-000 COVER SHEET, C-001 PROJECT NOTES C-100 OVERALL EXISTING <br />CONDITIONS PLAN, C-110 EXISTING CONDITIONS PLAN, C-210 SITE DEMOLITION <br />PLAN, C-300 OVERALL SITE LAYOUT PLAN, C-310 SITE LAYOUT PLAN, C-410 <br />EROSION CONTROL PLAN - STAGE 1, C-411 EROSION CONTROL PLAN - STAGE 2, <br />C-412 EROSION CONTROL PLAN - STAG,E 3, C-413 EROSION CONTROL PLAN - <br />DocuSign Envelope ID: 40CF07BE-0F08-4B66-B4FD-884A0A07C01CDocuSign Envelope ID: D14CEB36-3A5D-4960-8FE4-C29D1FBF03AD
The URL can be used to link to this page
Your browser does not support the video tag.