Browse
Search
Agenda - 12-09-2003-9f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 12-09-2003
>
Agenda - 12-09-2003-9f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 10:18:46 PM
Creation date
8/29/2008 10:37:06 AM
Metadata
Fields
Template:
BOCC
Date
12/9/2003
Document Type
Agenda
Agenda Item
9f
Document Relationships
Minutes - 20031209
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />DATE: <br />TO: John Link, Cotanty Manager <br />FROM: Wilbert McAdoo, Public Works Director <br />RE: <br />Generators <br />Orange County currently has a number of emergency power generators in place at County <br />buildings and facilities. Table 1 below presents a summary of each, including the capacity and <br />a general description of the areas and equipment served by each, <br />Preventive maintenance, including routine "exercising" of generators is, provided by the Motor <br />Pool Division of Public Works. Motor Pool staff provide additional service inspections and fuel <br />top-ups based on forecasts of severe weather, <br />Table 1 <br />Existing Orange County Emergency Power Generators <br />Location .Size/Capacity Areas/Equipment Served' <br />Stationa Generators <br />Cedar Grove Fire Station 1.5 KVA Various lights and <br /> rece tacles <br />Communications Tower 30 KVA All communications <br /> equipment; small electric <br /> heater <br />Efland Sewer Station 125 KVA Sewa e um s <br />EMS 911 Center 73,7 KVA Communication center, EOC, <br /> various li hts throu hout <br />Fuel Station 30 KVA All operations <br />Jail 80 KVA Fire alarm, exit lights, <br /> basement lights, telephone <br /> equip, various outlets <br /> throu h-out <br />Motor Pool Old 11 KVA Entire buildin - no HVAC <br />Motor Pool (New) (includes Public Works 80 KVA All operations excluding <br />Admin buildin coolin <br />Purchasing & Central Services Building 60 KVA Entire building including <br /> HVAC, telephone equip and <br /> PC servers <br />
The URL can be used to link to this page
Your browser does not support the video tag.