Browse
Search
Agenda - 12-09-2003-9d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 12-09-2003
>
Agenda - 12-09-2003-9d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 10:18:53 PM
Creation date
8/29/2008 10:37:05 AM
Metadata
Fields
Template:
BOCC
Date
12/9/2003
Document Type
Agenda
Agenda Item
9d
Document Relationships
Minutes - 20031209
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY <br />BOARD OF COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: December 9, 2003 <br />SUBJECT: Southern Orange Senior Center Plan <br />DEPARTMENT: Purchasing and Central <br />Services, Aging & County <br />Manager <br />Action Age® a~ <br />Item No. <br />ing Process <br />PUBLIC HEARING: (Y/N) No <br />ATTACHMENT(S): INFORMATION CONTACT: <br />Proposed Timeline Pam Jones (919) 245-2652 <br /> Jerry Passmore (919) 245-2000 <br />Map of Site Gwen Harvey (919) 245-2300 <br /> TELEPHONE NUMBERS: <br /> Hillsborough 732-8181 <br /> Chapel Hill 968-4501 <br /> Durham 688-7331 <br /> Mebane 336-227-2031 <br />PURPOSE: <br />1. To outline the planning, design, construction process for the Southern Orange Senior <br />Center, including timeline; and <br />2. To recommend planning committee structure. <br />BACKGROUND: <br />Planning and Design Process <br />As background to the process, the Department on Aging is preparing a compilation of findings <br />from the series of public forums and community surveys held over the past several months to <br />gather input and ideas from seniors and the general public. Once this needs assessment has <br />been completed and the Board has approved the general scope of the project, a selection <br />process will commence for the design team who will complete the building, Recommendations <br />far interest groups to represent the senior community on the design committee are listed later in <br />this abstract. <br />As has been fhe case previously with design of buildings, the County would pursue amulti-step <br />process during which the architect/engineers translate the needs assessment scope of work <br />into design development drawings, a schematic design and finally the working drawings upon <br />which constn~ction will be based. County Commissioners and the design committee for the <br />Center would be updated and comments solicited at each of these milestones, A full <br />presentation is also suggested for all interested seniors at the conclusion of the schematic <br />design phase. <br />
The URL can be used to link to this page
Your browser does not support the video tag.