Orange County NC Website
15 <br /> Travis Myren said that this is separate. <br /> Commissioner Bedford asked if the warehouse issue was fixed. <br /> Travis Myren said yes. <br /> Slide #21 <br /> FY2022-23 Recommended County Projects <br /> • Piedmont Food &Agriculture Processing Faciiity- <br /> $242,000(p. 51) <br /> - Design and replace HVAC units at end of life <br /> - FundedbyArticle 46 Saies Tax <br /> E ul—,Typ, D—ril k. P—h—Doi. R.yHcomoni Dojo <br /> HJAC-EOIJP TaN Fka NU 1985 7172 <br /> r4�trra <br /> HOOC4MJP I Tram frra PUn.� 2U10 422 <br /> FNAC-0dJP TON Fkx N 2U10 7M <br /> 'hV q, tie Pura 2 <br /> HJAC.EOIJP Tram H6x P.,m- IDN 7, <br /> ` - -r <br /> � F <br /> ORANGE COUNTY <br /> tt "ORT]I CAROLIN t <br /> Travis Myren said this work will need to be done even if this building is used for <br /> something besides food incubation or is sold for other purposes. <br /> Slide #22 <br /> FY2022-23 Recommended County Projects <br /> • Roofing and Building Fa de Projects - $671,500 (p. 52) <br /> - Annual roof inspections& repairs-$25,000 <br /> - Replacement for both Whiffed buildings- $646.500 <br /> - Go ided by the 2022 update of the Roof Asset Management Plan <br /> (RAMP) <br /> ORANGE COUNTY <br /> 1WVT1 I CAROLINA <br /> 71 <br />