Browse
Search
2022-160-E-AMS-CT Wilson Construction Company-Improve the sidewalk at Court Street Annex to meet accessibility and remove wet damaged materials
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-160-E-AMS-CT Wilson Construction Company-Improve the sidewalk at Court Street Annex to meet accessibility and remove wet damaged materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2022 9:27:37 AM
Creation date
4/29/2022 9:27:07 AM
Metadata
Fields
Template:
Contract
Date
4/24/2022
Contract Starting Date
4/24/2022
Contract Ending Date
4/29/2022
Contract Document Type
Contract
Amount
$15,511.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lopez Construction Services, LLC ® <br />NCHUB CERTIFIED WBE <br /> <br />11/13/21 PO Box 2031 -- Chapel Hill, NC 27516 2 of 5 <br />919.672.6961 phone <br />mlopez@loco-cs.com <br /> <br />3 <br />GENERAL SCOPE: <br /> Place concrete debris and earth spoils in dumpster provided by CT Wilson <br /> Grade subgrade to comply with slopes required and or provided by CT Wilson <br /> Concrete wash out to be in concrete debris dumpster provided by CT Wilson <br />4 Excludes WWF reinforcing in new sidewalk <br />5 Excludes location of UG Utilities and Landscape Sprinkler lines <br /> <br />---EXCLUSIONS -- <br />The following items are SPECIFICALLY EXCLUDED from this proposal: <br />A Layout and or Surveying, our work will follow points provided by GC. <br />B Any Permits or Fees <br />C Any Design and or Engineering Fees or Costs <br />D Any Inspection Fees <br />E Overtime or Weekend Work: Our proposal includes our crews working a maximum of 40 hours per workweek. <br />F Increasing crew size, number of crews, or workforce work hours to accelerate the schedule. <br />G Winter Conditions Temporary heat or enclosures for demolition, concrete and or masonry installations during <br />cold weather, should the schedule dictate such installations <br />H <br />Hot Weather Conditions This proposal does not include cold water or ice added to mix nor does it include any <br />other measures to maintain desired temperature as required for Hot Weather Concrete and or Masonry <br />Installations. <br />I <br />CORE DRILLING: <br /> TEMP POWER BY OTHERS: <br />o GC to provide 480v 3p power to LOCO power pack <br />o GC to hire electrician for LOCO power pack connection, grounding and inspection for use on-site <br /> GPR or X-ray of walls and or slabs for location of existing utilities and or embedded items <br /> <br /> Slurry control to floors below is by others <br /> Disposal of slurry and cores. This proposal is based on GC providing dumpster on-site for debris and slurry <br />disposal <br /> LOCATION OF UNDER-SLAB UTILITIES <br /> VENTILATION AND O2 MONITORING for gas powered equipment if electrical power, as stated above is not <br />available. GC to provide adequate ventilation and provide continuous O 2 monitoring <br />J <br />SAW CUTTING: <br /> TEMP POWER BY OTHERS: <br />o GC to provide 480v 3p power to LOCO power pack <br />o GC to hire electrician for LOCO power pack connection, grounding, and inspection for use on-site <br /> LOCATING EXISTING UNDER-SLAB OR EMBEDDED UTILITIES: GPR or X-ray of slabs for location of existing <br />utilities and or embedded items <br /> LAYOUT to provide center line of trench and location of tie-in points. <br /> Concrete Slabs more than -on-Grade being a MAXIMUM <br /> <br /> REBAR REINFORCING: This proposal Is based on existing Slab-on-grade being reinforced with Welded Wire <br />Fabric (WWF) <br /> Disposal of concrete debris. This proposal is based on GC providing dumpster on-site for concrete debris <br /> Saw Cut and or Removal of Slab-on-Grade for abandoned underground utilities <br /> VENTILATION AND O2 MONITORING for gas powered equipment if electrical power, as stated above is not <br />available. GC to provide adequate ventilation and provide continuous O 2 monitoring <br />K <br />CONCRETE: <br /> Wash Out Pit GC to provide a legitimate wash out pit for our use for Ready Mix trucks and Concrete Pumps <br /> SUB-GRADE: <br />DocuSign Envelope ID: 2CC27F97-A3EE-4081-8063-798B4E4E563E
The URL can be used to link to this page
Your browser does not support the video tag.