Orange County NC Website
Lopez Construction Services, LLC ® <br />NCHUB CERTIFIED WBE <br /> <br />11/13/21 PO Box 2031 -- Chapel Hill, NC 27516 1 of 5 <br />919.672.6961 phone <br />mlopez@loco-cs.com <br /> <br /> <br />CONCRETE PROPOSAL <br />Lopez Construction Services, LLC (LOCO) hereby proposes the following <br />BASE BID: Four Thousand Eight Hundred Eighty-Seven Dollars ($4,887.00) <br />ALTERNATE: ADD Four Thousand Seven Hundred Fifty-Seven Dollars ($4,757.00) <br />This proposal is valid for 30 days. <br />This proposal must become part of any subcontract agreement. <br />Acceptance of this proposal includes acceptance of payments terms stated herein. <br />Proposal Request Drawing A5-01 Prepared by Smith Sinnett Dated 11.2.21 <br /> <br />--SCOPE-OF-WORK INCLUSIONS-- <br />INCLUDES all labor, material, equipment and insurance to complete the following scope of work <br />1 <br />BASE BID SCOPE: <br /> Saw cut existing sidewalk at new pad edge <br /> Remove approximately 33 SF of existing 4 thick sidewalk <br /> Excavate as required to establish subgrade for new 12 thick concrete pad <br /> Top of new concrete pad to be 3 -4 below existing stoop/landing per detail 2/A5-01 <br /> Install #4 Rebar 12 OCEW supported on plastic on castle chairs with sand base <br /> Install Expansion Joint on adjacent brick cheek walls <br /> Install forms as required <br /> Place and Finish 12 <br /> Remove forms and backfill slab edge to meet existing grade <br /> EXCLUDES: <br />o TRANSITION FROM LIFT CAB FLOOR TO EXISTING CONCRETE SIDEWALK <br />o TRANSITION FROM EXISTING SIDEWALK TO NEW PAD ELEVATION <br />2 <br />ALTERNATE SCOPE: <br /> Remove approximately 150 SF of existing 4 thick sidewalk from new chair lift pad to <br />existing sidewalk along street <br /> Replace approximately 150 with 4,000 PSI <br />NW concrete with Air <br /> Install new sidewalk sloped to comply with ADA requirements <br /> Install 5x5 flat turn around at sidewalk directional transition <br /> Install new sidewalk to accommodate the transition from lift floor to sidewalk <br /> Backfill along new sidewalks as required to transition from new sidewalk elevation to <br />existing grade <br /> TO: CT Wilson <br />ATTN: Jarred Shrieves <br />Email: Jarred.shrieves@ctwilson.com <br />DATE: REVISED November 13, 2021 <br />PROJECT: ADA Lift Sidewalk Replacement <br />LOCATION: Orange Co Sheriff Office 109 Court Street Hillsborough, NC <br />ADDENDA: NONE <br />DocuSign Envelope ID: 2CC27F97-A3EE-4081-8063-798B4E4E563E