Browse
Search
Agenda 05-03-22; 8-h - Orange County Facilities Master Planning
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2022
>
Agenda - 05-03-2022 Business Meeting
>
Agenda 05-03-22; 8-h - Orange County Facilities Master Planning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 3:34:10 PM
Creation date
4/28/2022 3:26:42 PM
Metadata
Fields
Template:
BOCC
Date
5/3/2022
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-h
Document Relationships
Agenda for May 3, 2022 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2022\Agenda - 05-03-2022 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit 1 Page 3 <br /> 14 <br /> OBA <br /> O'BRIEN ATKINS <br /> o Department Interviews- Following receipt and review of the survey information,the <br /> consultant will conduct in-person and/or virtual interviews with each of the 38 <br /> departments.This additional level of information will allow the consultant to: <br /> ■ Understand any planned organizational or operational changes <br /> ■ Understand the impact of COVID-19 and remote working on existing and future <br /> operations <br /> ■ Study departmental efficiencies <br /> ■ Assess existing operations in terms of function, operational mandates, related <br /> service requirements and individual facility and internal unit adjacencies to <br /> determine efficiencies via consolidation of functions, improvement of or sharing <br /> of space or the use of technology <br /> o Upon completion of all surveys and interviews,the consultant will create a department <br /> profile for each physical location.The department profiles will provide a consolidated <br /> location for each department's existing conditions,functional characteristics, issues, and <br /> any data relevant to developing Personnel and Space Needs Projections.These profiles <br /> will be used as tool throughout the master plan to identify: <br /> ■ Location or co-location issues <br /> ■ Critical adjacencies for optimum efficiency of space, consolidation and <br /> technology implementation <br /> ■ Historic growth trends and key growth factors <br /> ■ How customers access and receive services (in-person versus virtual) <br /> ■ How staff provides customer services (in-person versus virtual) <br /> o Space Standards & Benchmarking <br /> ■ Applicable industry, state, and/or local space standards will be reviewed and <br /> used as a benchmark to assess current space utilization. Attention will be given <br /> to the potential space impact of current operational and/or technological <br /> trends.The space standards will serve as a benchmark to assess current office, <br /> equipment, and parking space utilization for each department. <br /> ■ Based on public and private practice and the consultant's professional planning <br /> experience, recommended space standards for administrative office, support <br /> space, public areas and circulation, equipment and storage unit sizes, and <br /> parking will be provided. <br /> ■ For a master plan,the size of an individual office or area is not as important as <br /> the space-per-person or space-per-equipment standard. Based on the <br /> recommended net square foot space standards and the type of department <br /> (staff versus equipment driven),the consultant will recommend a space-per- <br /> unit (staff or equipment) allocation standard, expressed as department gross <br /> square foot(DGSF) per staff, for each department. <br /> Post Office Box 12037 1 Research Triangle Park, NC 127709 <br /> 919.941.9000 1 www.obrienatkins.com <br /> P13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.