Orange County NC Website
Article 6: Development Standards 95 <br /> Section 6.14: Stormwater Management <br /> (b) If the Erosion Control Officer disapproves the proposed234 changes, the <br /> proposal may be revised and resubmitted as a new proposal. If the <br /> proposal has not been revised and is essentially the same as that <br /> already reviewed, it shall be returned to the appliGantowning entity23e <br /> (c) The Erosion Control Officer shall report any such revisions to the Board <br /> of County Comm. inners it the next available business <br /> rneet+agPlanning Director. <br /> (B) Major Amendments to Approved SCM231 Plans and Specifications <br /> (1) Amendments to theMaior amendments to the approved SCM plans and <br /> specifications of the cCnn and/er then ratiop and m iptenanne plan n al <br /> which involve a change in the type of the SCM, a change in the location of the <br /> SCM, or an SCM area/volume increase greater than 50% of the approved SCM <br /> area/volume size OF loeatinp of the Str„nt„re may be approved by the Beard of <br /> County CommiSSiopersPlanning Director237 after receiving a recommendation <br /> from the Erosion Control Officer. <br /> (2) Proposed changes shall be prepared by a North Carolina registered professional <br /> engineer or landscape architect(to the extent that the General Statute-Chapter <br /> 89A,allows238) and submitted to and reviewed by the Erosion Control Officer. <br /> (3) Planning Director Review239 <br /> (a) If the Planning Director approves the proposed changes, the owning <br /> entity of the SCM shall file sealed copies of the revisions with the Erosion <br /> Control Officer. <br /> (b) If the Planning Director disapproves the proposed changes, the proposal <br /> may be revised and resubmitted as a new proposal. If the proposal has <br /> not been revised and is essentially the same as that already reviewed, it <br /> shall be returned to the applicant. <br /> (C) Revision of Plans Found to he inadequat°Approved SCM Operation and <br /> Maintenance Agreement (OMA)241 <br /> If the-Seu#ythe Erosion Control Officer finds that the operations and maintenance plan <br /> o,manua:SCM Operation and Maintenance Agreement (OMA) is inadequate for any <br /> reason due to proposed changes to the SCM, the owning entity shall be notified by the <br /> Erosion Control Officer of any required changes and shall mod-file/record eepies <br /> of thea revised agree neRt OMA with the Orange County Register of Deeds. -114e <br /> Grn�inn Control Officer, and the ewniRg en+it„The revised OMA shall be submitted to the <br /> Erosion Control Officer for review and approval prior to recordation by the owning <br /> entity 241 <br /> 6.14.12 Stormwater Discharges <br /> (A) Applicability <br /> 214 Text correction—added "proposed". <br /> 211 Consistent use of"owning entity". <br /> 211 Clarification that this sub-section is referencing"Approved SCM" Plans and Specifications. <br /> 211 Consistency with current state law and Model Ordinances. <br /> 211 Text corrections. <br /> 211 Clarification of requirements. <br /> 241 Clarification of requirements—this sub-section had been erroneously titled. <br /> 141 Clarification of requirements. <br /> Orange County, North Carolina—Unified Development Ordinance Page 6-111 <br />