Orange County NC Website
Article 6: Development Standards 94 <br /> Section 6.14: Stormwater Management <br /> (5)(6) Annua1-5-year SCM224 Maintenance Inspection Fee <br /> (a) The€ee-5-year SCM maintenance inspection fee for the first 5-year <br /> ep riod225 shall be paid before: <br /> 0) The release of any Final Certificate of Occupancy for Non_ <br /> Residential Proper issuance of the Certificate of Stormwater <br /> Compliance for the SCM.226 <br /> (ii) The release of the construction bond for Residential or Non_ <br /> Residential Proper release of up to 75% of the value of the <br /> SCM Performance Guarantee Perform an ce Guarantee.227 <br /> (b) The fee-5-vear SCM maintenance inspection fee shall be based upon the <br /> current Orange County Planning Fee Schedule, and shall be paid to <br /> Orange County following each annual 5-year SCM228 inspection. <br /> (c) Failure to pay the Anneal Maip+epanGe Inspection Fee5-year SCM <br /> maintenance inspection fee shall be deemed a violation of this <br /> Ordinance. <br /> 6.14.11 Amendments to Approved Plans and c^e^ii{ii^a+ii^^8SCMs229 <br /> (A) Minor Amendments to Approved SCM231 Plans and Specifications <br /> (1) Amendments Minor amendments to the approved SCM plans and specifications <br /> of the SCM and/or the operation and maintenance plan e maRual may be <br /> approved by the Erosion Control Officer, provided that the proposed231 changes <br /> do not involve a change in the type of the SCM, a change in the location of the <br /> SCM, or an SCM area/volumesoze increase greater than 50% of the approved <br /> SCM area/volume zsz <br /> (2) Proposed changes shall be prepared by a North Carolina registered professional <br /> engineer or landscape architect (to the extent that##e-General Statutes;Chapter <br /> 89A;allows)233 and submitted for review by the Erosion Control Officer. <br /> (3) Erosion Control Officer Review <br /> (a) If the Erosion Control Officer approves the proposed changes, the <br /> owning entity of the s+ormwater control str�act ,reSCM shall file sealed <br /> copies of the revisions with the Erosion Control Officer. <br /> 124 Correct reference to the 5-year inspection fee. Orange County does not require annual SCM inspection fees— <br /> NOTE: "S-year SCM maintenance inspection fee"is integrated through the remainder of Section 6.14, where <br /> warranted. <br /> 221 Clarification of requirements. <br /> 121 Clarification of requirements. <br /> 221 Clarification of requirements. <br /> 221 Clarification of requirements. <br /> 221 Section 6.14.11 describes the processes for amendments/revisions to approved SCM plans and specifications, <br /> as well as amendments/revisions to the SCM Operation and Maintenance Agreement,so the title of Section <br /> 6.14.11 has been revised to"Amendments to Approved SCMs". <br /> 211 Clarification that this sub-section is referencing"Approved SCM" Plans and Specifications. <br /> 231 Text correction—added "proposed". <br /> 212 Clarification of requirements. <br /> 233 Text corrections. <br /> Orange County, North Carolina—Unified Development Ordinance Page 6-110 <br />