Browse
Search
5.4.22 Planning Board Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2022
>
5.4.22 Planning Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 3:31:27 PM
Creation date
4/28/2022 3:25:17 PM
Metadata
Fields
Template:
BOCC
Date
5/4/2022
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
5.4.22 Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 6: Development Standards 87 <br /> Section 6.14: Stormwater Management <br /> (1) For all new development, there shall be no net increase in peak flow leaving the <br /> site from the pre-development conditions for the 1_year, 24_hour storm. <br /> (B) Standards for Jordan Lake Watershed <br /> (1) For all new development there shall be no net increase greater than 10% in peak <br /> flow leaving the site from the pre-development conditions consistent with 15-A <br /> NCAC 02H.1002 (44) and the most current"orsmon4-70 of the NODE 1 Stormwater <br /> Design Mangy a 171 <br /> (C) Calculating Peak Runoff Volume <br /> (1) The following are acceptable methodologies for computing the pre- and post- <br /> development conditions for the 1_year, 24_hour storm: <br /> (a) Rational Method, <br /> (b) Peak Discharge Method as described in the USDA Soil Conservation <br /> Service's Technical Release Number 55 (TR-55), <br /> (c) Alternative methods must be approved by the County. <br /> (2) The same method must be used for both the pre- and post-development <br /> conditions. <br /> 6.14.9 Stormwater Management Plan (SMP)172 <br /> (A) Required Approval <br /> The Erosion Control Officer shall not issue any permits Land Disturbing Permits <br /> LDPs 173 for new development on any land within Orange County subject to the <br /> provisions of this Section, unless and until a Stormwater Management Plan SMP has <br /> been reviewed and approved in accordance with Section 2.21.1 of this Ordinance. <br /> (B) Compliance with Requirements <br /> Any person engaged in new development activities as defined by this Section who fails to <br /> file a plan in accordance with this Ordinance, or who conducts any new development <br /> except in accordance with provisions of an approved St„rr.water Management pla- SMP <br /> shall be deemed in violation of this Ordinance. <br /> (C) Enforceable Restriction <br /> Approval of the Stormwater Management pl nSMP shall require an enforceable <br /> restriction on property usage that runs with the land, such as a recorded deed restriction <br /> or protective covenants, to ensure that future development and redevelopment maintains <br /> the site consistent with the approved Stormwater Management planSMP. <br /> 6.14.10 Operation and Maintenance of Stormwater Control Measures (SCMs) <br /> (A) P^ f-Performance GuaranteesFina Giial Se,....:+.,for SCMs114 <br /> See Section 6.22 of this Ordinance for crna o+A-n.Jords ! n4-&G &ApprovaI of the SMP <br /> shall be conditioned on the posting of an SCM Performance Guarantee in accordance <br /> 171 Reference to 15A NCAC 02H .1002 (44) is sufficient. <br /> "'Title of Section 6.14.9 revised to include the appropriate acronym for Stormwater Management Plans(SMPs)— <br /> NOTE. "Stormwater Management Plan"and"SMP"are integrated through the remainder of Section 6.14, <br /> where applicable. <br /> 173"Land Disturbing Permits" is correctly noted to match the Definitions section of this Ordinance and the <br /> appropriate acronym for Land Disturbing Permits(LDPs) is included—NOTE: "Land Disturbing Permit"and"LDP" <br /> are integrated through the remainder of Section 6.14, where applicable. <br /> "I Clarification that posting of financial security is specific to"SCMs"only. <br /> Orange County, North Carolina—Unified Development Ordinance Page 6-103 <br />
The URL can be used to link to this page
Your browser does not support the video tag.