Browse
Search
5.4.22 Planning Board Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2022
>
5.4.22 Planning Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 3:31:27 PM
Creation date
4/28/2022 3:25:17 PM
Metadata
Fields
Template:
BOCC
Date
5/4/2022
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
5.4.22 Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 6: Development Standards 72 <br /> Section 6.7:Additional Standards for MPD-CD <br /> Figure 6.7.2.A: MPD-CD Permitted Utility Adjustments <br /> Example <br /> Plan — -� <br /> I a <br /> e <br /> Shift<50' <br /> I <br /> 0 o Approved Utility Approved Stormwater Pond <br /> Permitted Utility Adjustment . Revised Stormwater Pond <br /> Required Setback(Not Adjustable) <br /> (B) Permitted Adjustments may be approved by the Planning Director. The Master Plan shall <br /> be revised to show all permitted adjustments and filed with the Planning Department for <br /> incorporation in the approved MPD-CD. Other changes to the Master Plan shall be <br /> approved by the Board of County Commissioners in accordance with the procedures <br /> specified in Section 2.9.2 of this Ordinance. <br /> 6.7.3 Final Development Plans <br /> (A) Site plans shall be submitted subsequent to MPD-CD Master Plan approval in <br /> accordance with the procedures established in Section 2.5 of this Ordinance. <br /> (B) Approval of detailed site plans and related material is an administrative action and no <br /> public notice or hearing is required. <br /> (C) After a MPD-CD district has been established, no zoning compliance permit, permit for <br /> Wand--Disturbing Activi y c+„rh;n +;";+"131, building permit, or the like, shall be issued <br /> for the site, unless and until the Planning Director has approved a site plan, prepared and <br /> approved in accordance with Section 2.5 of this Ordinance, for the development as a <br /> whole or each development lot/pod, in accordance with the approved Master Plan. <br /> (D) Approval of site plans shall be based on compliance with regulations applying at the time <br /> the land was zoned to MPD-CD. <br /> (E) The Planning Director shall certify that all conditions imposed by the Board of County <br /> Commissioners with the approval of the MPD-CD and Master Plan have been met and a <br /> report shall be provided to the County Manager within 30 days following the approval of a <br /> site plan for any property included within the MPD-CD. <br /> 6.7.4 Start of Construction & Extensions <br /> (A) Site plans shall be approved and construction started in accordance with the timetable <br /> approved with the Master Plan. If the site plan(s) have not been approved or no <br /> construction has started within the stated time frames, the Master Plan becomes void and <br /> Zs1"Land-Disturbing Activity" is correctly noted to match the Definitions section of this Ordinance—NOTE: "Land- <br /> Disturbing Activity"is integrated through the remainder of Article 6, where applicable. <br /> Orange County, North Carolina-Unified Development Ordinance Page 6-35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.