Orange County NC Website
Article 4: Overlay Zoning Districts 49 <br /> Section 4.2:Watershed Protection <br /> 4.2.10 Orange County Watershed Matrix105 <br /> Table 4.2.10 defines the land disturbance area thresholds (in square feet)that tripper the need for <br /> an Erosion & Sedimentation Control Plan and/or a Stormwater Management Plan. <br /> 4.2.1 <br /> Back Creek 20,000 21,780 43,560 **NA **NA <br /> E Haw Creek 20,000 21,780 43,560 **NA **NA <br /> Q **NA **NA <br /> Cane Creek *10,000 21,780 43,560 <br /> 3 <br /> Cane Creek Critical Area *10,000 21,780 43,560 **NA **NA <br /> w = Haw River(protected) 20,000 21,780 43,560 **NA **NA <br /> w Haw River(unprotected) 20,000 21,780 43,560 **NA **NA <br /> a- <br /> Q **NA **NA <br /> Ul E Jordan Lake(unprotected) 20,000 21,780 43,560 <br /> ** ** <br /> Jordan Lake(protected) 20,000 21,780 43,560 NA NA <br /> 0 <br /> _ **NA **NA <br /> 3 University Lake *10,000 21,780 43,560 <br /> a) <br /> Z **NA **NA <br /> � University Lake Critical Area *10,000 21,780 43,560 <br /> Flat River 20,000 12,000 21,780 2.2 0.33 <br /> Little River 20,000 12,000 21,780 2.2 0.33 <br /> a� <br /> Lu J Upper Eno *10,000 12,000 21,780 2_2 0.33 <br /> z @ Upper Eno Critical Area *10,000 12,000 21,780 2.2 0.33 <br /> LL <br /> Lower Eno (unprotected) 20,000 12,000 21,780 2.2 0.33 <br /> Lower Eno (protected) 20,000 12,000 21,780 2.2 0.33 <br /> Y Hvco Creek 20,000 NA NA NA NA <br /> O <br /> z <br /> Q <br /> 0 South Hvco Creek 20,000 43,560 43,560 NA NA <br /> *Waiver required. <br /> **Jordan Lake nutrient export regulations are not currently enforced, in compliance with State mandate. <br /> Orange County will resume enforcement of nutrient export regulations if/when the State mandate is revised. <br /> NOTES: <br /> [11 Thresholds are listed in square feet(SF). <br /> [21 Not part of larger development. <br /> [31 Nutrients listed in pounds/acre/year. <br /> [41 43,560 square feet= 1 acre. <br /> [51 21,780 square feet /Y acre. <br /> [61 10,890 square feet='/4 acre. <br /> [71 A site plan may also be constrained by stream buffer requirements and impervious surface <br /> limitations, in addition to typical zoning setback requirements. <br /> 105 NEW TABLE. Peer review comments included suggestion to move new Table 4.2.10 to a new Section 4.2.10. <br /> Orange County, North Carolina-Unified Development Ordinance Page 4-14 <br />