Browse
Search
5.4.22 Planning Board Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2022
>
5.4.22 Planning Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 3:31:27 PM
Creation date
4/28/2022 3:25:17 PM
Metadata
Fields
Template:
BOCC
Date
5/4/2022
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
5.4.22 Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
30 <br /> (1) Erosion and Sedimentation Control PlansPlans_ may be disapproved unless <br /> accompanied by an authorized statement of financial responsibility and <br /> documentation of propertv42 ownership. This statement shall be signed by the <br /> P8FE;Gn f,^,^^;,"„F8 sble financially Responsible Party43 for the land- <br /> distuFbiRg +;,,+„Land-Disturbing Activity or his/her44 attorney-in-fact. <br /> (2) The statement shall include the mailing and street addresses of the principal <br /> place of business of: (1)the p8FGGR fiRaRGial y F86PORGibleFinancially <br /> Responsible Party, (2)the owner of the land, and (3)any registered agents. <br /> (3) If the peFSOR fiRaRGial y FeSPORsi Financially Responsible Party is not a <br /> resident of North Carolina, a North Carolina agent must be designated in the <br /> statement for the purpose of receiving notice of compliance or non-compliance <br /> with the pIanErosion and Sedimentation Control Plan, the North Carolina <br /> Sedimentation Pollution Control Act of 1973, this Ordinance-or rules or orders <br /> adopted or issued pursuant to this Ordinance. <br /> (4) If the applicant is not the owner of the land to be disturbed, the draft Erosion <br /> Erosion and Sedimentation Control PlanControl-P--lan must include the owner's <br /> written consent for the applicant to submit a draft Erosion Erosion and <br /> Sedimentation Control PlanSertFel-Plan and to conduct the anticipated land- <br /> distuFbiRg +,„+„Land-Disturbinq Activity. <br /> {4)LqL If the applicant is not the owner of the land to be disturbed and the anticipated <br /> Land-Disturbing Activity involves the construction of utility lines for the provision <br /> of water, sewer, gas, telecommunications, or electrical service, the draft Erosion <br /> and Sedimentation Control Plan may be submitted without the written consent of <br /> the owner of the land, so long as the owner of the land has been provided prior <br /> notice of the prolect.45 <br /> 2.19.4 Review by the Soil &Water Conservation District <br /> (A) The Orange Soil and Water Conservation District shall review the EFOSMOR Erosion and <br /> Sedimentation Control PlanContFel Plan and submit any comments and <br /> recommendations to the Erosion Control Officer within 20 days after the Soil and Water <br /> Conservation District received the ErosionErosion and Sedimentation Control Plan, or <br /> within any shorter period of time as may be agreed upon by the District and the Erosion <br /> Control Officer. <br /> (B) Failure of the Soil and Water Conservation46 District to submit its comments and <br /> recommendations to the Erosion Control Officer within 20 days or any agreed- upon <br /> shorter period of time shall not delay final action on the€resien Erosion and <br /> Sedimentation Control PlanCsntFel Plan. <br /> 2.19.5 Review and Response to Erosion and Sedimentation Control Plans <br /> (A) Once an Erosion and Sedimentation Control Plan has been submitted to Orange County, <br /> the Erosion Control Officer shall determine whether the submittal is considered complete <br /> and shall confirm the appropriate review fees within five (5) business days. The Erosion <br /> Control Officer shall subsequently inform the applicant in writing of plan acceptance or <br /> plan resection, and of the appropriate review fees. An Erosion and Sedimentation Control <br /> 42 Revised to reflect the most current version of NCDEQ's model ordinance for E&SC. <br /> 43"person financially responsible" replaced with "Financially Responsible Party"so as to match the Definitions <br /> section of this Ordinance—NOTE. "Financially Responsible Party"is integrated through the remainder of Section <br /> 2.19, where applicable. <br /> 44 Text correction—added "/her". <br /> 41 Revised to reflect the most current version of NCDEQ's model ordinance for E&SC. <br /> 46 Text correction -clarification. <br /> Orange County, North Carolina—Unified Development Ordinance Page 3-Ixiv <br />
The URL can be used to link to this page
Your browser does not support the video tag.