Browse
Search
5.4.22 Planning Board Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2022
>
5.4.22 Planning Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 3:31:27 PM
Creation date
4/28/2022 3:25:17 PM
Metadata
Fields
Template:
BOCC
Date
5/4/2022
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
5.4.22 Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
25 <br /> 2.17.5 Approval Criteria <br /> (A) No application for a plat vacation shall be approved unless it complies with all applicable <br /> requirements of this Ordinance. <br /> (B) The approving entity shall not approve an application for a plat vacation if it will materially <br /> injure the rights of any non-consenting property owner or any public rights related to <br /> public improvements unless expressly agreed to by the agency with jurisdiction over such <br /> improvements. <br /> 2.17.6 Recording <br /> (A) After the new plat is approved, the plat must be recorded, within 60 days, with the <br /> Register of Deeds Office. <br /> (B) Upon the execution and recording of the new plat, the vacated plat has no effect. <br /> (C) The re-subdivision of the land covered by a plat that is vacated shall be platted in the <br /> same manner as is prescribed by this Article for an original plat. <br /> Section 2.18: LAND DISTURBING PERMITS <br /> 2.18.1 Generally <br /> (A) Before commencement of any Land-Disturbing Activity in excess of the thresholds as <br /> defined in the Orange County Watershed Matrix (Table 4.2.10 of this Ordinance), sag <br /> eater than 20,000 square feet, eater than 10,000 square foot of within the <br /> L ;vers+ty Lake rare Greer OF I iner Cne Watersheds the owner or his/her day <br /> appe;nted-ageRtFinancially Responsible Party shall obtain a Land Disturbing Permit <br /> L( DP)from the Erosion Control Officer. For developments that are subject to Orange <br /> County Stormwater Management requirements, if a permanent Stormwater Control <br /> Measure23 (SCM) is required as part of a Land-Disturbing Activity, the LDP will not be <br /> issued by the Erosion Control Officer until the owner or his/her Financially Responsible <br /> Party posts a Performance Guarantee for construction of the SCM in conformance with <br /> Section 6.22 (F)of this Ordinance.24 <br /> (B) Land Disturbing oerm'tsLDPS must be obtained prior to the start of the la-Rd <br /> dosturba Activity. <br /> (C) Every perms+-LDP issued by the Erosion Control Officer shall expressly prohibit open <br /> burning of trees, limbs, stumps and construction debris associated with the permitted <br /> activityLand-Disturbing Activity. <br /> (D) If a developer, corporation, private landowner or other person proposes to perform <br /> construction/filling activities in or near a lake, stream, creek, tributary or any unnamed <br /> body of water and its adjacent wetlands, Federal permit authorization may be required by <br /> the U.S. Army Corps of Engineers prior to commencement of earth dirt shirr <br /> actotmesLand-Disturbing Activities. <br /> zz Section 2.18 title updated to include appropriate acronym for Land Disturbing Permits(LDPs)—NOTE: "LDP"is <br /> integrated through the remainder of Section 2.18, where applicable. <br /> 23"Stormwater Control Measure" is correctly noted to match the Definitions section of this Ordinance, includes the <br /> appropriate acronym for Stormwater Control Measure(SCM)—NOTE. "Stormwater Control Measure"and"SCM" <br /> are integrated through the remainder of Section 2.18, where applicable. <br /> 21 Section 2.18.1 (A) updated so as to: 1) reference the"Orange County Watershed Matrix Table" (located in new <br /> Section 4.2.10)for determining land disturbance thresholds specific to each watershed within Orange County, 2) <br /> better reflect current standard operating procedures for obtaining a Land Disturbing Permit, 3) include the <br /> requirement for a performance guarantee if an SCM is required as part of Land-Disturbing Activities,4) replace the <br /> term "duly appointed agent"with "Financially Responsible Party"so as to match the Definitions section of this <br /> Ordinance,and 5) reference the new Section 6.22. <br /> Orange County, North Carolina—Unified Development Ordinance Page 3-lix <br />
The URL can be used to link to this page
Your browser does not support the video tag.