Browse
Search
5.4.22 Planning Board Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2022
>
5.4.22 Planning Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 3:31:27 PM
Creation date
4/28/2022 3:25:17 PM
Metadata
Fields
Template:
BOCC
Date
5/4/2022
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
5.4.22 Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Index 158 <br /> +r„gfi Ural nnGR tFUG+„ral m en+_hosed owning entity of the Stormwater Control <br /> pros+ice used singularly nr ;n GE)mbiRat'GR +n Measure (SCM), and shall meet the <br /> reduce requirements of SL 2019-79 (SB 313). <br /> non point source pollution to receiving waters n <br /> order to achieve water quality protection and Stormwater, Stormwater Management <br /> n�atePlan (SMP)313 <br /> quantitygoals.I limitation (See oleo' Detention A set of plans and supporting calculations <br /> Pondpnn onrl FnnineererJ Stormwater(�nn+rnlcl <br /> The term takes the place of what was prepared and sealed by a North Carolina <br /> registered professional engineer or landscape <br /> previ2uslVer4ea4y referred to,and defined as a architect (to the extent that the General Statute <br /> `Best Management Practice' or Chapter 89A allows), detailing how a proposed <br /> `BMP'. (See also, Detention Pond, Engineered development will meet the requirements of <br /> Stormwater Controls, Infiltration SVstems) Section 6.14 of this Ordinance. A Land <br /> Disturbing Permit (LDP) maV not be issued bV <br /> Stormwater, SCM Operation and the Erosion Control Officer until a Stormwater <br /> Maintenance Agreement (OMA)370 Management Plan (SMP) is reviewed and <br /> A notarized and recorded agreement requiring approved. The SMP shall meet the <br /> the owning entity of a Stormwater Control requirements of the most current version of the <br /> Measure (SCM)to maintain, repair and, if NCDEQ Stormwater Design Manual. <br /> necessary, reconstruct the SCM in conformance <br /> with the approved Stormwater Management Stream <br /> Plan (SMP). The SCM Operation and A body of concentrated flowing water in a <br /> Maintenance Agreement shall include the natural low area or natural channel on the land <br /> required SCM Operation and Maintenance Plan surface. <br /> (as "Attachment A") and shall meet the <br /> requirements of the most current version of the Stream Buffer <br /> NCDEQ Stormwater Design Manual. An area of land adjacent to a stream or a FEMA- <br /> identified floodplain, whichever is greater, which, <br /> Stormwater, SCM Operation and except as permitted within this Ordinance, must <br /> Maintenance Plan (OMP)371 remain undisturbed in its natural state. Streams <br /> A written plan describing the detailed are identified by any of the following means: <br /> requirements, corrective actions, and roles a) Shown as solid blue lines or as broken <br /> related to the operation and maintenance of a blue lines on the USGS Quadrangle <br /> Stormwater Control Measure (SCM) . The SCM maps, <br /> Operation and Maintenance Plan must be b) Shown as a water feature in the Orange <br /> attached to the SCM Operation and County Soil Survey, or <br /> Maintenance Agreement (as "Attachment A") c) A water feature identified by a field <br /> and shall meet the requirements of the most determination of County staff trained in <br /> current version of the NCDEQ Stormwater surface water identification through the <br /> Design Manual. North Carolina Division of <br /> Environmental Quality(NCDEQ). <br /> Stormwater, SCM Derf„rmanne Stream buffers shall extend around the <br /> G aranteePerformance Guarantee372 perimeter of all other water features if any <br /> A financial assurance instrument used to portion of the stream buffer touches the water <br /> guarantee the complete construction of a feature. Disputes pertaining to water feature <br /> Stormwater Control Measure (SCM) in identification decisions by County staff shall be <br /> conformance with the approved Stormwater filed directly to the NCDEQ. <br /> Management Plan (SMP). The SCM <br /> performance r- aran+eePerformance Guarantee <br /> instrument shall be secured and posted by the <br /> 370 NEW DEFINITION—this definition has been added 372 NEW DEFINITION—this definition has been added <br /> in order to support applicable stormwater section(s) in order to support applicable stormwater section(s) <br /> of this Ordinance. of this Ordinance. <br /> 37'NEW DEFINITION—this definition has been added 373 NEW DEFINITION—this definition has been added <br /> in order to support applicable stormwater section(s) in order to support applicable stormwater section(s) <br /> of this Ordinance. of this Ordinance. <br /> Orange County, North Carolina—Unified Development Ordinance Page Index-44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.