Orange County NC Website
Article 6: Development Standards 123 <br /> Section 6.22: Performance Guarantee Standardserformance Gurantee308F <br /> cer+ifica+ion door! nd n nn+& the a nlican+ &hall file the deed and <br /> 8a68MeRtS with the ()ran a CG Rty Register E)f D ('onro <br /> Deeds. The-E�oeien�-a+rml <br /> Officer shall authorize the release of p to 750% of the value of the performance <br /> guar_araa.ntee a�andd issue a \�a oo_ater/atershed�_d Protection CorniAm e Rerm'+for ie_9C A 343 <br /> (8) If SCM deficiencies are found during SCM inspection and/or the submitted SCM <br /> documents are considered by the Erosion Control Officer to be incomplete, then <br /> the Erosion Control Officer shall direct the owning entity that the necessary SCM <br /> improvements be made and/or documents corrected and resubmitted for <br /> approval. Upon completion, the SCM improvements shall be re-inspected by the <br /> Erosion Control Officer. <br /> If deficienGies a e foWnd the Gresion ('ontrol Officer shall direr•+that+he <br /> fer gal I Ipon n fi nlnon the im pots shall her 0RSj9eGtnd 334 <br /> (9) No sooner than one year after issuance of the Certificate of Stormwater <br /> Compliance for the SCM, the owning entity petition the Planning Director to <br /> release the remaining value of the SCM Performance Guarantee. Upon receipt of <br /> said petition, the Erosion Control Officer shall inspect the SCM to determine <br /> whether the SCM is performing as designed and intended. The Erosion Control <br /> Officer shall present the petition, the SCM inspection report, and <br /> recommendations to the Planning Director. <br /> (a) If the Planning Director accepts the petition and SCM inspection report, <br /> then the Erosion Control Officer shall release the remaining value of the <br /> SCM Performance Guarantee. <br /> If the Planning Director does not accept the petition and/or SCM <br /> inspection, then the Erosion Control Officer shall provide the owning <br /> entity with instructions to correct any SCM deficiencies necessary for the <br /> release of the remaining value of the SCM Performance Guarantee.8ne <br /> vear from the recordinn of the deed easements and maintenance <br /> a reement the applicant ma i petition for the release of the remaininn <br /> value of the performance n arantee <br /> Upon receipt of said petition the Erosion (control Officer shall in ect th <br /> SGIVI to determine whether the r•on+rels a erforminn as desinned and <br /> IRteRded. if they are, the rem n f,,nds shall beTeWFRed. ITrGtithe <br /> Cro&inn f`ontrol Officer W011 note idnn+ifnd deficiencies and require <br /> GOfre6tOE)R E))f same. QRGe n ple+ed the a nliGan+G request a fellow <br /> i 13 c+inn <br /> BID <br /> !B!g <br /> Orange County, North Carolina—Unified Development Ordinance Page 6-164 <br />