Orange County NC Website
Article 6: Development Standards 122 <br /> Section 6.22: Performance Guarantee Stand a rdse rforman ce Gurantee308F <br /> and approved bV the Erosion Control Officer prior to recordation bV the <br /> owning entity. <br /> (b) Draft SCM Operation and Maintenance Agreement (OMA), ready for <br /> filing/recording with the Orange County Register of Deeds. The draft <br /> OMA shall be reviewed and approved by the Erosion Control Officer prior <br /> to recordation by the owning entity. <br /> (c) SCM certification letter sealed bV a North Carolina registered <br /> professional engineer or landscape architect (to the extent that General <br /> Statute Chapter 89A allows), stating that the SCM is complete and <br /> consistent with the approved SMP. <br /> (d) SCM as-built drawing(s) sealed bV a North Carolina registered <br /> Professional Engineer or Landscape Architect (to the extent that General <br /> Statute Chapter 89A allows), stating that the SCM is complete and <br /> consistent with the approved SMP. <br /> (6) The SCM Performance Guarantee shall not be released fer--�A until the <br /> following requirements are met: <br /> (a) The SCM passes inspection by the Erosion Control Officer;.. <br /> (b) AnAn SCM Operation and Maintenance Agreement (OMA) in <br /> conformance with Section 6.14 of this Ordinance )-has been hi++owl <br /> reviewreviewed and /approved bV the Erosion Control Officer and <br /> subsequently, recorded bV the owning entity at the Orange <br /> County Register of Deeds; OR QeserdanEe with Sest;on 6.14 of +h,s <br /> ��344 <br /> The signed SCM maintenance easement-d <br /> by the Erosion Control nffiGor GRG8 the fnlloWinr. inf,rm afio <br /> (c) Thy . "eed(s)/plat(s), or subdivision deed(s)/plats(s) in <br /> conformance with Section 6.14 of this Ordinance have been <br /> reviewed/approved by the Erosion Control Officer and subsequently <br /> recorded bV the owning entity at the Orange County, related easements <br /> and s urvov Plat for the SCM roadv for fillinq with the Oranoo County <br /> Registerrar of Deeds; <br /> The SCM certification letter and the SCM as-built drawing(s), <br /> (d) sealed bV an engineer or landscape architect (to the extent that the <br /> General Statute Chapter 89A allows), have been reviewed/approved by <br /> the Erosion Control Officer;.- <br /> (e) The owning entity pays the required 5-year SCM inspection fee as <br /> described in Section 6.14.10(B)(6) of this Ordinance. <br /> A certification coaled by an^ cronninoorC�or landscape architect (te+ho extent <br /> that theen- General Statute, Chapter 89A,-89A, allow) statinq that the deem kin <br /> pond is complete and consistent with_i�+he_plans_and specifications. <br /> (7) If the SCM passes inspection and the Erosion Control Officer approves all of the <br /> required SCM documents as described in this Ordinance, then the Erosion <br /> Control Officer shallw+ll release up to 75% of the value of the SCM Performance <br /> Guarantee and shalkwa 14 issue a Certificate of Stormwater Compliance for the <br /> SCM, subject to approval of the Planning Director. <br /> If then eGt Passes oration and the F=FGSiGR QGRtrr,I Officer a onto the <br /> tiRg req Rtlo1 as detailed iR SeEtiOR G 9/I 1-0 of the i inn <br /> ExiStiRg requirement(s)as detailed in SeEtien c 1 n 1n(C) of the i inn <br /> Orange County, North Carolina—Unified Development Ordinance Page 6-163 <br />