Browse
Search
Agenda 05-03-22; 8-a - Minutes
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2022
>
Agenda - 05-03-2022 Business Meeting
>
Agenda 05-03-22; 8-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 3:33:38 PM
Creation date
4/28/2022 3:23:58 PM
Metadata
Fields
Template:
BOCC
Date
5/3/2022
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-a
Document Relationships
Agenda for May 3, 2022 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2022\Agenda - 05-03-2022 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
24 <br /> 1 Slide #34 <br /> FY2022-23 Recommended Emergency Services <br /> Projects <br /> • <br /> EMS Substation Project - $410,000 (p. 63) <br /> — Paging and antenna systems atWaterstane and Etland - <br /> 110,000 <br /> — Design fees for oollacation with Chapel Hill fire- $300,000 <br /> _i <br /> r" floorplan <br /> llpi� <br /> F11 _ II <br /> _ J <br /> ORANGE GE COUP <br /> 2 <br /> 3 Travis Myren said the floorplan shown is a sample for the Waterstone colocation. He <br /> 4 said Fire and EMS each have their own portion of the building with vehicle bays in the center. <br /> 5 Commissioner Fowler asked if the facility is new or is existing and if renovations are <br /> 6 planned. <br /> 7 Travis Myren said this will be a new facility with existing staff. He said in later years there <br /> 8 are some net new facilities anticipated and those would be additions to the system and require <br /> 9 additional personnel and operating expenses. <br /> 10 <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.