Orange County NC Website
15 <br /> 1 Travis Myren said that this is separate. <br /> 2 Commissioner Bedford asked if the warehouse issue was fixed. <br /> 3 Travis Myren said yes. <br /> 4 <br /> 5 Slide #21 <br /> FY2022-23 Recommended County Projects <br /> Piedmont Food &Agriculture Processing Facility- <br /> 242,000(p. 51) <br /> - [Design and replace HVAC units at end of life <br /> - Funded by Article 4G,Safes Tax <br /> E ul mbu[T Ikde PrdL llaro RiOmAmAniodw <br /> W,I,C-EGJP T.—H6u P— 1985 7.2 <br /> IWAaa-_J. mn tim2tiou <br /> r1.+wE•-i+J95 Tram F,ar W� 20}0 <br /> ,+'•r.lc ECiJP T—Fist[N a p 7=c'2 <br /> .::r..FLUP Tfam Flea Prost MOD i T•23 <br /> ORANGE COUNTY <br /> NOQ'n I CAROLINA <br /> 6 <br /> 7 Travis Myren said this work will need to be done even if this building is used for <br /> 8 something besides food incubation or is sold for other purposes. <br /> 9 <br /> 10 Slide #22 <br /> FY2022-23 Recommended County Projects <br /> Roofing and (Building Facade Projects - $671,500 (p. 52) <br /> - Annual rc&inspections& repairs-$259000 <br /> - Replacementfor both Whitted buildings- $646,500 <br /> - Guided by the 2022 update of the Roof Asset Management Plan <br /> (RAMP) <br /> f�. �.:'�� r �d,!IT i <br /> 11 � <br /> 12 <br /> 13 <br />