Orange County NC Website
12 <br /> 1 Slide #7 <br /> FY20 1- 6 Recommended Capital Investment Plan <br /> • Major County Projects <br /> — EMS Substation Plan <br /> Pwn s L"*Ilcfs Co.d*,d by ENCS SysiomArmOysls <br /> Years land 2 Cclacat9onwHh Chapel HE Fre-$300,000forPlanning in FY2022-23 <br /> Two hMC hkw Subsiad,ansn Y*ar*5 and 9 <br /> — Emergency Responder Radio System <br /> Nsw Appcoach Using E+-Dir*cWnalAnWnnas ioAchl*veSuading P*nvlratan <br /> • Reduce Number of TowersNeaded <br /> $Wy and Acc Ilon Fundt+e FY2022;23•'5347,W <br /> — Blackwood Farm Park Phase II Planning <br /> N"Hop*CbMh Road Ovefto <br /> PicnicAree <br /> Planning Funds in FY2022,23-$110. <br /> ORANGE COUNTY <br /> n10rcTI i'CILROLINA <br /> 2 f <br /> 3 Travis Myren said that there is an EMS systems study underway that will align call <br /> 4 volumes with where the stations are located. He said that colocation has been requested by <br /> 5 Chapel Hill Fire. He said that there are no additional stations until years 5 and 8. He said that <br /> 6 will allow time to plan for those stations. <br /> 7 Commissioner McKee asked about the year 1-2 colocation with Chapel Hill Fire. <br /> 8 Travis Myren said there is currently a colocation, and this will be an additional station. <br /> 9 He said the system study will show which station will be best for the colocation. <br /> 10 Commissioner McKee asked if the colocation would change after years 1 and 2. <br /> 11 Travis Myren said no. <br /> 12 Commissioner McKee said he feels strongly about colocation. <br /> 13 Travis Myren said it makes sense from a capital and operating standpoint. <br /> 14 Travis Myren said the Emergency Responder Radio System was a high ticket item at <br /> 15 over $40 million and was driven by need to place towers at less densely populated areas of the <br /> 16 county to achieve building penetration. He said technology has evolved, and bi-directional <br /> 17 antennas are now an option. He said the CIP is recommending a study to review thirty sites and <br /> 18 the outcomes will have a dramatic impact on the number of new tower sites that will need to be <br /> 19 built. <br /> 20 Travis Myren said the Blackwood Farm will be a nice addition to the county's park <br /> 21 system. He said there is planning for a phase 3 that will be $775,000. <br /> 22 <br /> 23 <br />